Laserfiche WebLink
Section No 15 <br /> Revision No 0 <br /> Date September 5, 1991 <br /> Page 2 of 2 <br /> QA/QC objectives and to initiate the necessary changes to assure future <br /> compliance The Project Manager shall consult with the Principal-in-Charge <br /> or Quality Control Officer prior to implementation of any significant changes <br /> in procedures, and shall document any changes via memos to file, or <br /> additions/changes to the sampling and analysis plan or quality assurance <br /> project plan If changes to the SAAP or QAPP are made, the Principal-in- <br /> Charge, Quality Assurance Officer, and client must review and sign the new <br /> procedures prior to their official implementation If the changes are of such <br /> a magnitude that they constitute a modification to the project scope and <br /> budget, the procedures in Section 4 4 shall also be followed <br /> 15-2 <br />