My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006259
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
ARCHIVED REPORTS_XR0006259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:12:06 PM
Creation date
3/23/2020 4:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006259
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section No 10 <br /> Revision No 0 <br /> Date September 5 , 1991 <br /> Page 2 of 10 <br /> ■ The Project Manager shall assign a staff or project level team <br /> member the responsibility for validating or reporting the field <br /> measurements, <br /> ■ The assigned individual shall validate all field measurements used <br /> or presented in a MARK report by <br /> - checking the calibration procedures utilized at the specific <br /> site; <br /> - comparing the data to previous measurements obtained at the <br /> specific site; <br /> - reviewing the daily reports for adherence to established <br /> protocols, <br /> - reviewing the data for reasonableness <br /> ■ The assigned indi.vidival will document his review in the project <br /> file, <br /> o The assigned individual will report to the Project Manager on any <br /> variations or anomolies in field data which cannot be explained by <br /> local conditions, <br /> c The Project Manager will review the questioned data and determine <br /> how and if the data should be used in MARK reports or engineering <br /> evaluations <br /> 10 1 3 Laboratory Data <br /> Laboratory data validation and reporting procedures will be performed in <br /> accordance with the following protocols <br /> ■ The Project Manager shall assign a staff or project level team <br /> member the responsibility for validating and reporting the <br /> laboratory data, <br /> ■ The assigned individual will validate all laboratory data used or <br /> presented in MARK reports by <br /> reviewing the quality control data associated with the <br /> laboratory data for compliance with established procedures , <br /> protocols and quality assurance objectives (i a precision, <br /> accuracy and completeness) , <br /> 10-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.