My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006259
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
ARCHIVED REPORTS_XR0006259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:12:06 PM
Creation date
3/23/2020 4:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006259
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section No 10 <br /> Revision No 0 <br /> Date September 5, 1991 <br /> Page 4 of 10 <br /> ■ Upon completion of his review the assigned individual shall <br /> - initial the computer software as acceptable and approved, and <br /> - initial the computer-processed data as acceptable and approved, <br /> or <br /> - report back to the Project Manager with specific reasons why the <br /> computer-processed data are unacceptable <br /> 10 1 5 Engineering Calculations <br /> Data validation and reporting procedures for engineering <br /> calculations will be performed in accordance with the following protocols <br /> ■ All engineering calculations will be performed, initialed, and dated <br /> on MARK calculation sheets, <br /> o <br /> All equations used as a basis for calculations shall be referenced <br /> and numbered in MARK reports and calculation sheets, <br /> o The Project Manager will assign a registered engineer in the <br /> appropriate field to review the engineering calculations , <br /> The assigned review engineer will review the calculations and if <br /> found to be satisfactory, initial and date the calculation sheets <br /> 10 1 6 Reports and Drawings <br /> All reports and drawings shall be reviewed and approved by the Project <br /> Manager and the Principal-in-Charge prior to release Reports shall be <br /> distributed and maintained in accordance with the procedures outlined in <br /> Section 10 2 <br /> • <br /> 10-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.