Laserfiche WebLink
Section No 10 <br /> Revision No 0 <br /> Date September 5, 1991 <br /> Page 4 of 10 <br /> ■ Upon completion of his review the assigned individual shall <br /> - initial the computer software as acceptable and approved, and <br /> - initial the computer-processed data as acceptable and approved, <br /> or <br /> - report back to the Project Manager with specific reasons why the <br /> computer-processed data are unacceptable <br /> 10 1 5 Engineering Calculations <br /> Data validation and reporting procedures for engineering <br /> calculations will be performed in accordance with the following protocols <br /> ■ All engineering calculations will be performed, initialed, and dated <br /> on MARK calculation sheets, <br /> o <br /> All equations used as a basis for calculations shall be referenced <br /> and numbered in MARK reports and calculation sheets, <br /> o The Project Manager will assign a registered engineer in the <br /> appropriate field to review the engineering calculations , <br /> The assigned review engineer will review the calculations and if <br /> found to be satisfactory, initial and date the calculation sheets <br /> 10 1 6 Reports and Drawings <br /> All reports and drawings shall be reviewed and approved by the Project <br /> Manager and the Principal-in-Charge prior to release Reports shall be <br /> distributed and maintained in accordance with the procedures outlined in <br /> Section 10 2 <br /> • <br /> 10-4 <br />