My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006259
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
ARCHIVED REPORTS_XR0006259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:12:06 PM
Creation date
3/23/2020 4:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006259
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Section No 10 <br /> Revision No 0 <br /> Date September 5, 1991 <br /> Page 10 of 10 <br /> 10 2 5 Confidential Document Control <br /> All project documents will be considered as confidential Specific <br /> proceudres which will be followed to maintain confidentiality include the <br /> following <br /> ■ all documents/files will be secured in locked file cabinets or <br /> equally secure areas during other than normal working hours, unless <br /> the files are personally attended by a person authorized to have <br /> access to such files, <br /> ■ a continuous and permanent record will be maintained of all persons <br /> who access any documents/files, including for each file the person <br /> having access, date and period of access, and location of file, <br /> ■ employees who are not members of the project team or management are <br /> not allowed immediate or direct access to confidential <br /> files/documents without approval of the Project Manager or <br /> Principal-in-Charge <br /> 10 2 5 1 Confidentiality Agreement - All MARK employees will record <br /> and sign a Confidential Disclosure Agreement, acknowledging that they are <br /> familiar with and agree to abide by the confidential document control <br /> procedures outlined in Section 10 2 5 <br /> 10 2 5 2 Security Audits - The Principal-in-Charge will periodically <br /> schedule security audits to determine if the confidential document control <br /> procedures are being followed The Principal-in-Charge will implement <br /> corrective actions fudged as necessary to correct any deficiencies noted <br /> during the security audit <br /> 10-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.