Laserfiche WebLink
Ill rim MARK Water Purging &- <br /> GROUP g <br /> r <br /> ENGINEERS a GEOLOGISTS. INC Sampling Lo <br /> Date Sample Location _ _1`�I LJ r <br /> Project Name o-��G{1 L�,i? . Project No . I 11 1 1-7 l O 3. <br /> Weather Conditions11 9V A <br /> Observations/Comments `AP-R AXARMA <br />� Samples Collected By J ��-- <br /> QUALITY CONTROL <br /> Purging/Sampling Method (J <br /> Method to Measure Water Level �YL� <br /> Pump Lines or Bailer Ropes: new leaned dedicated <br /> Method of Cleaning Bailer/Pump L-(d(A" 2* avAi/ aA4eL <br /> pH Meter No. e13 a/0 6 Date Calibrated <br /> Sp Conductance Meter No. Date Calibrated <br />' TV ' V9,;�7 1-69 PURGING AND SAMPLING DATA <br /> Water Level [below MP) tart �6, V- 99 7 7 End -,/6, <br /> �a- d � • <br /> �9 3�. <br /> Measuring Point SMP) C <br /> Time Pump-Raite` 'D C� <br /> scharge pH Temp Sp, nd Color Odor Turbidity <br /> (gpm°) (t�llods) VC) (Amhos/cm) <br /> /eq.0 <br /> if'�/ l(�- 20- 0 ??-Icay?2, <br /> /[ ZD 31) o F D 8, .d 41 <br /> 0 pal, 70 <br /> 60 11 <br /> 7a- <br /> Total Discharge Casing Volumes ,- J ` <br /> Method of Disposal of Discharge Water <br /> Sheet—/ of <br />