Laserfiche WebLink
MARK r Water Purging & <br /> ,IITHE <br /> rim <br /> GROUP Sampling Log <br /> EFIGINE£RS 5 GEOLOGISTS, INC <br /> Date 44 " 1 3 - Sample Location <br /> Project Name Project No., C i o <br /> Weather Conditions <br /> Observations/Comments <br /> ' Samples Collected By { <br /> QUALITY CONTROL <br /> Purging/Sampling Method <br /> ur <br /> Method to Measure Water Level <br /> Pump Lines or Bailer Ropes: cleaned dedicated <br /> Method of Cleaning Baller/Pump <br /> pH Meter No. dam! 0, Date Calibrated U` 13-0) Y <br /> Sp Conductance Meter No. Oq Date Calibratedr <br /> PURGING AND SAMPLING DATA <br /> Water Level (below MP) Start .r W t' End /6 y 3 q <br /> Y377q <br /> Measuring Point imp) / 0 <br /> Time Pump;Rate` D scharge pH Temp Spend Color Odor Turbidity <br /> (igpm) (&Llion's) VC) Pimhos/cm) <br /> r <br /> �:S�k �.�. c� c5 4' 37 Al ' Y90 f< Ir <br /> 9/ S S /-�T�7 cS r/ <br /> da <br /> M1/16 —9L dS <br /> & .P <br /> 1� e <br /> Total Discharge Casing Volumes `� 7 <br /> Method of Disposal of Discharge Water <br /> Sheet. of _� <br />