My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006286
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
ARCHIVED REPORTS_XR0006286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:12:19 PM
Creation date
3/23/2020 4:06:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006286
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />' TABLE OF CONTENTS <br />' SECTION ONE INTRODUCTION AND SUMMARY <br /> 11 Introduction <br /> - Drawing 1-1 - Site Location <br /> SECTION TWO UNDERSTANDING OF CLIENT REQUIREMENTS <br />' 21 Sources of Hydrocarbon Impacted Soil <br /> 22 Recent Activities to Further Evaluate Hydrocarbon <br />' Impacts <br /> 23 Alternative for Soil Remediation/Disposal <br /> 231 Transportation and Off-Site Treatment and Disposal <br /> 232 On-Site Bioremediation with Off-Site Disposal <br /> 233 On-Site Hybrid Thermal/Biological Treatment <br /> 234 Comparison of Alternatives <br /> lie <br /> - Drawing 2-1 - Site Layout <br /> - Drawing 2-2 - Treatment Enclosures <br /> - Drawing 2-3 - Hybrid Thermal/Biological Process <br /> - Drawing 2-4 - Treatment Pile Module <br /> SECTION THREE WORK SCOPE AND APPROACH <br /> ' 31 Monitoring Well Closure <br /> 32 Permit Acquisition <br /> ' <br /> 33 Soil Excavation and Remediation <br /> 34 Monitoring Well Installation <br /> 35 Excavation, Backfill, Compaction and Paving <br /> Drawing 3-1 - Proposed Monitoring Well Locations <br /> SECTION FOUR DETAILED SCHEDULE <br /> 41 Project Schedule <br /> - Figure 4-1 - Project Schedule <br /> ' ATTACHMENTS <br /> ' Attachment A Site Specific Health & Safety Plan <br /> Attachment B Master Health & Safety Plan <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.