My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006286
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
ARCHIVED REPORTS_XR0006286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:12:19 PM
Creation date
3/23/2020 4:06:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006286
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION ONE <br /> INTRODUCTION AND SUMMARY <br /> The following workplan describes activities relating to supplemental <br /> investigation of soil and groundwater and remediation of soil impacted by <br /> petroleum hydrocarbons Soil to be remediated includes material already <br /> excavated and yet to be excavated from the vicinity of former petroleum <br />' fuel storage tanks at the Stockton Scavengers site at 1240 Navy Drive in <br /> Stockton, California The site location is shown in Drawing 1-1 <br /> In this workplan, we have described the situation surrounding the <br /> hydrocarbon impacted soils and groundwater and the potential need for <br /> remediation services Prior t_o_a detailed description_of the_ proposed <br /> scope of work, Section 2 provides a discussion_ of_prenaus mvestigationi <br /> and compares three potential_soil remedial alternafives-on" the basis of <br /> effe_cfiveness,regulatory acceptance, affil c60 In addition, the integration <br /> of these proposed services with other ongoing and/or proposed site <br /> investigation, construction and cleanup activities is discussed By working <br /> with an integrated schedule, vital cleanup and construction activities will <br />' proceed in an orderly and cost effective manner <br /> In Section 3, we have provided a detailed description of the work scope, <br />' and approach <br /> In Section 4, we have provided a detailed critical path schedule for the <br />' project <br />' 1-1 <br /> COMPANY CONFIDENTIAL TRADE SECRET AND PROPRIETARY INFORMATION OF TBE MARK GROUP Mr <br />
The URL can be used to link to this page
Your browser does not support the video tag.