Laserfiche WebLink
Chronology 2059 Navy Drive, Stockton Page 2 <br /> of the former UST and dispenser. Soil and groundwater samples were <br /> collected for analysi-s. A report of this work was not submitted to EHD. <br /> 2/10/2006 Geo-Phase, the current consultant on the project,,installed 3 monitoring <br /> wells on this date. The MWs were located outside of the 3 geoprobe <br /> borings completed by Arcadis three months earlier. <br /> i <br /> 03/30/2006 The date of the Geo-Phase MW Construction Report that was'submitted to <br /> GeoTracker. <br /> 03/20/2007 The date of the Geo-Phase Site Conceptual Model report which contains: <br /> site history, site assessment soil and groundwater analytical results, results <br /> from the 11/21/05 Environmental Assessment, a site conceptual model, <br /> and a request for site closure. <br /> I <br /> i <br /> i <br /> i <br /> I <br /> I <br />