Laserfiche WebLink
Former Nelson Ready Mix Page 2 <br /> Work Plan-Monitoring Well Construction <br /> GPE Project No.518.2 <br /> January 17,2006 <br /> diesel-range petroleum hydrocarbons. All three samples contained hydrocarbons at j <br /> concentrations from 1,400 to 19,000 parts per billion (ppb). The report of the soil boring <br /> installation recommended that groundwater monitoring wells be constructed to further <br /> assess the extent of the groundwater contamination. <br /> i <br /> 3.0 SCOPE OF WORK <br /> The following tasks will be completed to accomplish the goals of this Work Plan: <br /> • Drill and construct three new. groundwater monitoring wells to investigate the <br /> extent of gasoline-impacted groundwater. <br /> • Complete a receptor survey by obtaining information about nearby water <br /> production wells. <br /> the fieldwork and summarizing the <br /> Complete a detailed report documenting g <br /> laboratory analytical work. The report will discuss the results and implications of <br /> the data and will make recommendations regarding the future course of action. <br /> Ls <br /> 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone(209)569-0293 1 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />