My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2191
>
3500 - Local Oversight Program
>
PR0545601
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:27:16 PM
Creation date
3/23/2020 4:19:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545601
PE
3528
FACILITY_ID
FA0003588
FACILITY_NAME
EAGLE ROOFING PRODUCTS
STREET_NUMBER
2191
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16331006
CURRENT_STATUS
02
SITE_LOCATION
2191 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Me] Bokides Petroleum, Inc. -2- March 26, 1999 <br /> r <br /> 1. help the responsible party undertake the necessarycorrective action in a cost-effective efficient fFicicnt ani <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> i <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate i <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> .,interim remedial action after: (1)notifying.the regulatory_agency of the proposed action, and; (2) <br /> complying with any requirements that the regulatory agency may set.-Interim remedial actyon should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. <br /> i <br /> Three bids and Cost Prea roval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for reimbursement. You must comply 1 <br /> with all regulatory agency time schedules and requirements and you must obtain three bids for any 1 <br /> required corrective action. Unless waived in writing, you are required to obtain preapproval of costs for i <br /> all future corrective action work. If you do not obtain three bids and cast preapproval, reimbursement <br /> is not assured and casts may be rejected as ineligible. <br /> If you have any questions,please contact me at(916) 227-4411. <br /> Sincerely, <br /> 4 <br /> I <br /> Sandy Gill <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Mr. Gordon Boggs Ms. Margaret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San.Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> California Environmental Protection Agency <br /> �� Recycled Pnper <br />
The URL can be used to link to this page
Your browser does not support the video tag.