My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006082
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2191
>
3500 - Local Oversight Program
>
PR0545601
>
ARCHIVED REPORTS_XR0006082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:54:14 PM
Creation date
3/23/2020 4:46:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006082
RECORD_ID
PR0545601
PE
3528
FACILITY_ID
FA0003588
FACILITY_NAME
EAGLE ROOFING PRODUCTS
STREET_NUMBER
2191
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16331006
CURRENT_STATUS
02
SITE_LOCATION
2191 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 24 June 2005 <br /> AGE-NC Project No 98-0534 <br />' Page 2 of 6 <br /> Soil was continually sampled from the boring with a 4-inch split-spoon core sampler ahead of the <br />' drill bit The sampling equipment was washed in an Alconox solution and rinsed with water prior <br /> to each sampling run to minimize cross-contamination <br /> 2 12 Soil Logging <br /> Soil was extruded from the core barrel with a clean tool The soil was then visually described in <br /> accordance with the Unified Soil Classification System (see boring log in Appendix A) 5 <br /> 213 Well Completions ��j ► (�4 <br />' Pilot boring MW-9 was completed as a ground water monitoring wellu ng 2-1 diameter PVC <br /> casing with a 0 020-inch slotted screen installed from approximately 6 to 65 eet bsg The filter <br />' pack (No 3 Lonestar sand) was installed from 57 to 65 feet bsg, and a nominal 2-foot bentonite <br /> pellet plug was then installed above the filter pack and hydrated The well was then grouted to near <br /> the surface with portland cement,and a water-tight,traffic-rated well box was installed over the well <br />�. An as-built well diagram is depicted on the boring log in Appendix A <br />' 2 14 Monitoring Well Development <br /> On 17 February 2005, monitoring well MW-9 was developed by AGE Ground water was purged <br />' from the monitoring well using a steel bailer until ground water was visually sediment free, <br /> approximately 84 gallons of water were removed from the well with a Wattera tubing bailer <br />' Temperature, pH and conductivity of purged ground water were measured at 20 gallon intervals <br /> using an Oakton water analyzer Copies of the field data sheets are in Appendix B Purged water was <br />' temporarily stored on-site in Department of Transportation (DOT)-approved 55-gallon drums <br /> pending proper disposal <br /> 2 15 Equipment Decontamination <br />' All augers were cleaned prior to advancement in each boring location The sampling equipment was <br /> washed in an Alconox solution and triple rinsed with water prior to each sampling run to avoid <br /> cross-contamination <br /> Advanced GeoEnwronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.