Laserfiche WebLink
INSULATION AS REQUIRED r , <br /> WELD OR SOLDER SECURE DUCT TO CURB v �, <br /> WATERTIGHT ALL z I WITH SCREWS 12" ON U <br /> DUCT ABOVE ROOF I I CENTER ALL AROUND METALLIC OR NON-METALLIC BAND OVER INSULATION (TYPICAL) f� - co <br /> CURB CAP I ao ACOUSTICAL LINING <br /> HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED DUCT L 1 ay o <br /> ROOF DECK WITH FASTEN INTO WOOD INSULATED, WITH VOLUME DAMPER r Ud < <br /> v <br /> AND DAMPER LOCK WITH EXTENSION -co <br /> Q <br /> _ <br /> BUILT-UP ROOFING; NAILER. FOIL TAPE AT L_ z m ai <br /> EXTEND TO TOP I f— E <br /> OF CURB z LL! <br /> I I <br /> JOINT--/ <br /> INSULATION <br /> CURB FASTENING I I I U <br /> FLANGE I N I ROOF CURB SEE NOTE 1. = III W rn - <br /> 0... ~ cv <br /> I PRE-INSULATED FLEXIBLELiJ <br /> Z w <br /> I I DUCT AS REQUIRED, � <br /> a <br /> INSTALL PERMANENTLY (oO <br /> SEALED AND SUPPORTED <br /> I I TO PREVENT KINKING AND <br /> I I SHARP TURNS <br /> SECURE CURB TO co <br /> METALLIC OR NON-METALLIC <br /> PROVIDE 1" THICK, R-6 FIBERGLASS INSULATION Z co <br /> ROOF WITH METHODI ROOF STRUCTURE SEE BAND (TYPICAL) TO COMPLETELY COVER DIFFUSER CONE WHERE <br /> CONSISTENT WITH II ARCHITECTURAL AND SCHEDULED OR SPECIFIED. <br /> ROOF CONSTRUCTION _ _ STRUCTURAL PLANS CEILING DIFFUSER WITH VOLUME <br /> FOR DETAILS DAMPER AS SCHEDULED SEISMIC BRACING <br /> ROOF OPENING AND CONNECT DUCT TO CURB MID) <br /> SIZE PER CURB <br /> MANUFACTURER'S EXTEND ACOUSTICAL LINER <br /> APPROVED DRAWINGS J; <br /> FIRST 10' FROM FAN OR <br /> AS OTHERWISE SPECIFIED CEILING THIS DRgwINGISANINSTRUMENT OF <br /> NOTES: SERVICE AND AS SUCH SHALL REMAIN <br /> THE PROPERTY OF NEPTUNE DESIGN <br /> GROUP LLC.UNAUTHORIZED USE OF <br /> 1. SPUD BACK GRAVEL A MINIMUM OF 30" IN ALL DIRECTIONS. FLASH WITH 90# REPRODUCTION WITHOUT PERMISSION <br /> MINERAL FACED BASED FLASHING. STRIP WITH THREE LAYERS OF ROOFING FELT` OF THE ARCHITECT ISPROHIBITTED. <br /> 1. EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT CONNE� ITONwITHTHISPROJECTAND <br /> EMBEDDED IN HOT ASPHALT. GRAVEL TO MATCH. EXCEED 5'-0". PROVIDE RIGID 90' ELBOW WHERE REQUIRED TO KEEP FLEXIBLE <br /> SHALL NOT BE USED FOR OTHER <br /> ARECTANGULAR AIR DUCT DUCT WITHIN 5'-0" LENGTH .IMITATION. LOCATIONS.COPYRIGHT2017. <br /> 1 NOT USED NOT USED <br /> NO SCA2 No SCALE 3 PENETRATION THROUGH ROOF DETAIL LAY-IN TYPE CEILING DIFFUSER DETAI L <br /> NO SCALE O <br /> CONNECT TO SUPPORTING CONNECT TO SUPPORTING NSCALE <br /> STRUCTURAL MEMBER STRUCTURAL MEMBER <br /> / /' /� <br /> W <br /> EXHAUST FAN ~ <br /> / 7 — — CONNECT TO SUPPORTING CONNECT TO SUPPORTING K1 <br /> / STRUCTURAL MEMBER 1!1 <br /> x TRANSVERSE i� STRUCTURAL MEMBER WITH BIRDSCREEN <br /> < BRACE / 1/2" CLEAR NCE I z m <br /> MAXIMUM 1 I - - - INSTALL NON-VENTED c7 ILL. <br /> ` Ln <br /> o I \� 2 MAX I i CURB EXTENSION IF ZERO z� o j O) <br /> T �� 1 MIN r z CLEARANCE FIRE-RATED <br /> \ r F LONGITUDINAL WRAP IS UTILIZED, VENTED WEATHERPROOF w Q Q <br /> o DUCT SIZE CABLE BRACE <br /> VERTICAL HANGER i m CURB EXTENSION IF A (NEMA 3R) qt= m W V <br /> w �` I N LONGITUDINAL FIRE-RATED DISCONNECT ¢ V Q <br /> r o GABLE BRACE NON-COMBUSTIBLE SWITCH <br /> O r no TRANSVERSE ENCLOSRE IS a W U <br /> I FAN BASE HINGE c z <br /> o"` � I \ r � / CABLE BRACE / CONSTRUCTED c <br /> / LONGITUDINAL HANGER I i '^ c a <br /> ONE EACH SIDE OF DUCT I 0 c <br /> � y 1/2" CLEARANCE � i � � GREASE TRAP c <br /> Ole MAXIMUM 1/4" THREADED ROD TO INSTALL NEOPRENE I D D O C I OVERSIZED af V <br /> HORIZONTAL BRACE � STRUCTURE <br /> r B ELECTRICAL GASKET BETWEEN mo Li 0 <br /> Q ¢-- -- -- - ---- - - - EXHAUST DUCT DUCT AND FAN COVER GALVANIZED a <br /> WIRING BY � <br /> � - I ELECTRICAL RE: MECHANICAL PLAN z <br /> m -1 m I TRANSVERSE BRACE PREFABRICATED TWO PIECE > <br /> ¢ CL BOLTS EQUAL CONTRACTOR <br /> Z)w 3 DUCT 51Zfw OF ANGLES N BACKDRAFT INSULATED CURB WITH o 0 <br /> _ TREATED WOOD NAILER GALVANIZED Goo m <br /> FAN HOUSING <br /> ROpF INSULATION FLASHING <br /> m 2 MAx I r ER COUNTER -� ¢ <br /> Ixw <br /> 1„ Q 1 MIN L� -I LONGITUDINAL AND CURB <br /> I o TYPICAL <br /> ¢ 4 SIDES I PLATE SHEET METAL STRAP <br /> (I1 can WASHER {MIN 2-1/2"x12 GA, STRAP) 0 <br /> - T 1/4" MAX 3" LONG ANGLE <br /> FLEX CONNECTOR d <br /> INSULATION WHERE REQUIRED PLATE WASHER <br /> TRANSVERSE HANGER LONGITUDINAL HANGER o <br /> ROOF DECK REFER TO <br /> NOTES, A BRACING DETAIL B BRACING DETAIL EXHAUST GRILLE CEILING ARCHITECTURAL DRAWINGS WELDED EXHAUST DUCT. SEE <br /> 1. CABLE BRACES MAY BE USED FOR SEISMIC RESTRAINT IN LIEU OF ANGLE BRACES. /y PLANS FOR SIZE AND c o <br /> NO SCALE NO SCALE PROVIDED WITH LOCATION. INSTALL ZERO <br /> EXHAUST FAN CLEARANCE FIRE-RATED WRAP <br /> CENTER SEISMIC BRACING DOUBLE HANGER SEISMIC CABLE OR CONSTRUCT A FIRE--RATED <br /> CEILING MOUNTED EXHAUST FAN SUPPORT NON-COMBUSTIBLE ENCLOSURE. <br /> cJ FOR RECTANGULAR DUCTS BRACING FOR ROUND DUCTS UP TO 84" 7 No SCALE <br /> NO SCALE 6 UPBLAST GREASE EXHAUST FAN DETAIL <br /> 8 NO SCALE <br /> NO SCALE o <br /> ro <br /> ROOF <br /> KITCHEN EXHAUST <br /> d � <br /> FAN, KEF-1 & KEF-2 VENTED ROOF CURB. SEE <br /> DETAIL #8 THIS SHEET. <br /> TRANSITION GREASE <br /> d <br /> SLOPE HORIZONTAL DUCT 1/4" PER FOOTEXHAUST DUCTS TO <br /> 6.. ROOF CURB (COORDINATE <br /> FIRE RATED WALL CLEANOUT SIZE WITH ROOF CURB <br /> ROOF SUPPLIER <br /> MIN. 4 LB DENSITY MINERAL WOOL OR d <br /> EQUIV. COMPRESSED PACKING <br /> MATERIAL. PROVIDE 2000+ SILICONE ROOF JOIST <br /> e 5 SEALANT BOTH SIDES OF WALL. MAKEUP AIR DUCT <br /> \ � GREASE EXHAUST DUCT <br /> 1 e\ e 6 10.5" 3" 3" MINIMUM PERIMETER AND —2—HR FIRE WRAP, SEE <br /> IN, LONGITUTINAL OVERLAP EACH VOLUME <br /> DAMPER (TYP) DETAIL #10 THIS SHEET. <br /> 2 e e, ] <br /> e LAYER AT 21" ON CENTER _Z GREASE DUCT CLEANOUT. <br /> 3 o e e n 5 TWO LAYERS OF 3M, 615+ FIRE (TYPEHOODI #1 & HOODLISTE2) SEE DETAIL #9 THIS SHEET. <br /> CEILING SEE SHEET H11'...--, --_ DATE: 10.17.2018 <br /> ° -- <br /> e <br /> 11--4GREASE DUCT BARRIER DUCT WRAP. BANDING / l �� 3" HOOD STANDOFF. REVISION <br /> OVERLAP INSTALLATION SHOWN. CEILING ACCESS PANEL J SEE NOTE 7 <br /> ALTERNATIVE OVERLAP METHOD FLAME—GUARD SPARK <br /> AND FULL PINNING IN LIEU OF ARRESTOR GREASE FILTERS Al ., <br /> BANDING IS ACCEPTABLE, COMPLY MAKE-UP AIR SUPPLY DIFFUSER <br /> ___ <br /> WITH MANUFACTURER'S WRITTEN —� 6"MIN. GREASE DRAIN WITH <br /> 3 ACCESS HOLE -- <br /> 10 INSTALLATION INSTRUCTIONS. REMOVABLE CUP <br /> 2 1/4 IN. (6mm) DIAMETER ALL THREADED RODS `—ANGLE IRON HANGER WITH ALL-THREAD - INCANDESCENT <br /> 3 ACCESS COVER 16 GAUGE Q <br /> 11 ROD TO UPPER ATTACHMENT. SPACING, cO EXHAUST HOOD <br /> - <br /> 4 INSULATED PINS ANGLE THICKNESS, AND ROD DIAMETER io LIGHTS <br /> - WELDED PER DUCT SUPPORT SPECIFICATIONS. <br /> 5 FIRST LAYER FIRE BARRIER DUCT WRAP CUT SAME SIZE AS COVER <br /> 6 SECOND LAYER FIRE BARRIER DUCT WRAP WITH 1 IN. (25mm) STAINLESS STEEL BANDING MINIMUM 1/2" WIDE COOKING EQUIPMENT Q <br /> AND 0.015" THICK, AT 10.5" ON CENTER. DO FLOOR SEE EQUIPMENT LIST ��4a��G H 84 <br /> OVERLAP ON ALL SIDES -_ ._ ___.._ <br /> NOT DAMAGE WRAP OR SCRIM FOIL FACING. NOTES: _ y <br /> 7 THIRD LAYER FIRE BARRIER DUCT WRAP WITH 1 IN. (25mm) 1. SUBMIT SHOP DRAWINGS OF ALL HOOD SYSTEMS TO CITY FOR APPROVAL PRIOR TO cc �, <br /> OVERLAP ON ALL SIDES OF PREVIOUS LAYER �+ <br /> FOR DUCTS 24" AND LARGER IN WIDTH, PROVIDE 12 GA. INSTALLATION. m <br /> m <br /> SPEED CLIPS COPPER COATED STEEL INSULATION PINS WITH GALV. 2. TOTAL HOOD SYSTEM TO BE IN COMPLETE CONFORMANCE WITH NFPA, AND ALL LOCAL 36618 <br /> 9 <br /> 9 ALUMINUM TAPE COVERING ALL EXPOSED EDGES STEEL SPEED CLIPS, 1-1/2" DIAMETER, ON BOTTOM OF CODES AND REGULATIONS. �� GPS \� <br /> 10 SPOOL PIECES FOR THREADED RODS HORIZONTAL DUCTS AND SIDES OF VERTICAL RISERS. 3. COORDINATE ALL ANSUL FIRE PROTECTION SYSTEMS WITH FIRE PROTECTION CONTRACTOR 9rF INAN1 <br /> F C <br /> .. <br /> SPACE PENS 10-1/2 ON CENTER BOTH DIRECTIONSWHO SHALL ALSO BE RESPONSIBLE FOR ALL PERMITS AND TESTING REQUIREDOF <br /> 11 1 4 IN. (6mm) DIAMETER WING NUTS �^ <br /> FOR REFERENCE ONLY. INSTALL PER MANUFACTURERS RECOMMENDATIONS. <br /> 4. PROVIDE WRAP SYSTEM WHERE APPROVED BY LOCAL CODES IN LIEU OF RATED ENCLOSURE <br /> 5. PROVIDE ACCESS PANELS AS REQUIRED BY LOCAL CODE. <br /> GREASE DUCT FIRE WRAP INSULATION 6. HOODS SHALL EXTEND MINIMUM 6" BEYOND ALL OPEN SIDES AND FRONT EDGE OF FOOD MECHANICAL <br /> 9 GREASE DUCT CLEANOUT ACCESS DOOR INSTALLATION DETAIL COOKING EQUIPMENT BEING SERVED. DETAILS <br /> NO SCALE O NO SCALE <br /> KITCHEN EXHAUST HOOD ELEVATION <br /> NO SCALE <br />