My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4040
>
2900 - Site Mitigation Program
>
PR0545496
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 3:24:47 PM
Creation date
3/24/2020 3:09:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545496
PE
2957
FACILITY_ID
FA0003564
FACILITY_NAME
BLUE STAR
STREET_NUMBER
4040
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15727503
CURRENT_STATUS
02
SITE_LOCATION
4040 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V . <br /> 4040 East Main Street <br /> Page 2 of 2 <br /> • Report 1, 2-dichloroethane (1, 2-DCA) and 1, 2-dibromoethane <br /> (EDB) at 0 . 5 micrograms per liter (µg/L) in groundwater, <br /> if possible, during the quarterly monitoring events; and <br /> • Analyze groundwater and soil samples for total petroleum <br /> hydrocarbons as gasoline (TPH-g) and diesel (TPH-d) by <br /> EPA SW-846 method 8015B; benzene, toluene, ethyl benzene <br /> and total xylenes (BTEX) ; di-isopropyl ether (DIPS) , <br /> ethyl tertiary-butyl ether (ETBE) , methyl tertiary-butyl <br /> ether (MTBE) , tertiary-amyl methyl ether (TAME) , tertiary <br /> butyl alcohol (TBA) , methanol , ethanol, 1, 2-DCA, and EDB <br /> by EPA SW-846 method 8260B. <br /> COMMENTS AND CONDITIONS: <br /> • Obtain the boring permit from the Environmental Health <br /> Department (EHD) . <br /> • Notify EHD at least 72 hours prior to the proposed <br /> scheduled work date. <br /> • Submit a site-specific health and safety plan to EHD <br /> prior to commencement of the fieldwork. <br /> • Complete the fieldwork by July 7, 2004 . <br /> • Submit the monitoring well installation report to EHD <br /> within eight weeks of completing the fieldwork. This <br /> report must include boring logs, and analytical results <br /> for soil samples . <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN (H&S Section <br /> 25296 . 10 (c) (3) ) : <br /> • None . <br /> DATED: May 24 , 2004 BY: <br /> Victoria L. McCartney, REHS <br /> (209) 468-3456 <br /> Cc : James L. L. Barton, CVRWQCB <br /> Robert E. Marty, Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.