My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4040
>
2900 - Site Mitigation Program
>
PR0545496
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 3:26:09 PM
Creation date
3/24/2020 3:13:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545496
PE
2957
FACILITY_ID
FA0003564
FACILITY_NAME
BLUE STAR
STREET_NUMBER
4040
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15727503
CURRENT_STATUS
02
SITE_LOCATION
4040 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WINZLER & KELLY, INC. <br /> STANDARD OPERATING PROCEDURES FOR SOIL SAMPLING <br /> FOR VOLATILE ORGANIC COMPOUNDS <br /> BLUE STAR PROPERTY <br /> 4040 EAST MAIN STREET <br /> STOCKTON,CALIFORNIA <br /> 1. Objective <br /> To establish accepted procedures for conducting soil sampling activities for volatile organic <br /> compounds from an excavation, boring, stockpile or the ground surface in accordance with <br /> standard practices by engineering professionals. <br /> 2. Background <br /> Following removal of an underground storage tank, over-excavation of apparently <br /> contaminated soil from an excavation, drilling a soil boring, or surface sampling, soil <br /> sampling is performed. The confirmation sampling may consist of soil sampling or soil and <br /> water sampling. (Refer to the Winzler& Kelly SOP for Water Sampling From an <br /> Excavation). Additionally, sampling of the stockpiled soil may be performed. <br /> Numerous state and local agencies have established criteria for the number and location of <br /> confirmation samples required. Prior to conducting the field activities, the requirements of <br /> the governing agency shall be reviewed in order to ensure compliance. <br /> 3. Personnel Required and Responsibilities <br /> Project Manager: The Project Manager(PM) is responsible for ensuring that field personnel <br /> have been trained in the use of these procedures and for verifying that the sampling <br /> procedures are performed in compliance with this SOP. At a minimum,the PM will <br /> maintain contact with the client or contractor involved, will ensure the proper <br /> number/locations of samples to be collected in accordance with the local governing agency, <br /> will be available by phone during the field activities and will review field notes for <br /> completeness. <br /> Project Scientist: The responsible professional in charge of the field work is responsible for <br /> complying with this SOP. Responsibilities include preparation for field activities, ensuring <br /> equipment is in working order prior to the field event,providing adequate field <br /> documentation of events, observations, readings,measurements and sampling activities. The <br /> project scientist must collect samples and prepare them for transport to the laboratory. The <br /> Project Scientist is responsible for complying with this SOP. <br /> SOP Soil Sampling for 5035 VOCs 1 of 4 August 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.