My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:06:45 AM
Creation date
3/24/2020 3:32:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J N I F IED -1 710C AM CONSOLIDATED F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae I of 2) <br /> - --- - - _ 490.1 <br /> TYPE OF ACTION Rr1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> PLAN TYPE ,�I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. ago 2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - - 1 <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> 103. 104. <br /> BUSINESS SITE ADDRESS 7�3IV ���WAA z: cITY 5�- c k �✓ <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2639,2641) <br /> 490.30. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> M.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o.4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY Q b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 4906 <br /> - +`� --- ,�----- e9oa. MODEL#: L .S 3 SZ� a� <br /> PANEL MANUFACTURER: �v E�J� Ab c^ <br /> 419. MODEL S .__ x,` 490,10 <br /> LEAK SENSOR MANUFACTURER: 2�,�/ 3' )- �� $S9 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKLS5 (23 CCR§2643) 490-11 <br /> 490-12. MODEL#: 490-13 <br /> PANEL MANUFACTURER: _ <br /> 0.90-14. MODEL#(S): 490-15 <br /> IN-TANK PROBE MANUFACTURER: <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490.16 <br /> ❑ d.MONTHLY ----❑ c.OTHER(�R_ ago 17 <br /> ------------- --------------------------------------- <br /> --___-_--_ <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p_h. ❑ b.0.2 g_p.h. ❑ c.OTHER(Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> 490-211 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490,22 <br /> 490-23 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2645.1): 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 4W27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METROD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> 29 <br /> SECONDARY CONTAINMENT IS:Wa.DRY [lb-LIQUID FILLED .❑c.PRESSURIZED ❑d_UNDER VACUUM _ 490 31 <br /> PANEL MANUFACTURER: /Qti'a r <br /> 490-30 MODEL#: T L 3 SZ 490.31 <br /> x9°32 MODEL#S �3 9S� '�70t� 490.33 <br /> LEAK SENSOR MANUFACTURER: �.�� ( )� � <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e-,TURBINE)SHUTDOWN. ff a.YES ❑b.NO 490.34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Ba.YES ❑b.NO ago 3s <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED CCR 490.36 <br /> MLLD MANUFACTURER(S): 490.37 MODEL#(S): `/8 T '1£Sc CSO 490.38 <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLDMANUFACTURERS) -1+/ 9._C, 4900.0 MODEL#(S): 49"1 <br /> 490.42 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 02 g-P- <br /> g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. [�a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-44 <br /> 4.PIPE INTEGRITY TESTING 4go-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4904649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-49 <br /> FREQUENCY ❑ a.DAILY ❑ b_WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 490.49 <br /> •AllouYd formmtm nR 0f unburied emageozy gennumfild PiPinfouly Pet HSC§25281.5(b)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490.50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 490.52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> 1tP('F 1tCT_1)(1�_f2007\1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.