Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FOF. <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.544 <br /> vo-sat, <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS []99.OTHER(Specify): <br /> PANEL MANUFACTURER: 490-51 MODEL#_ TL S' 3S"ZL 490-56. <br /> LEAK SENSOR MANUFACTURER: 490"57 MODEL#(S): 7</ — SSO — 3C 2- 190-5a <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a"YES ❑b"NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS []I.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑I.LIQUID ❑2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO ago Gab <br /> VII.PERIODIC SYSTEM TESTING <br /> El 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.l <br /> 2.SECONDARY CON AINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS 490-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49x-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ❑"Alarm logs 490-baa 12 Visual Iaspection Records 490a3b ❑Tank integrity testing results 490-6U <br /> ❑SIR testing results(and supporting documentation records). 490-baa ❑ Tank gauging results(and supporting documentation records). 490-bay <br /> ❑ATG Testing results(and supporting documentation records).490-68r ❑ Corrosion Protection 60-day logs 490-68g <br /> ❑Equipment maintenance and calibration records. ago-bah <br /> IX.TRAINING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49o-6% <br /> ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49"W <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490fi9g <br /> ❑ OTHER(Specify):t t69h•M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> D Names of contact person(s)for emergencies and monitoring alamns.49o-7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49o-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained property. <br /> The following person(s)are responsible for orming the monitoring and equipment maintenance: <br /> NAME ' //" Li a9o-rz TITLE VrL/-V/, 490-73 <br /> NAME -epollw/tl kt/3o 1c-154V4,<_ 490.74 TITLE 490-75 <br /> The Designa/Cd Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that aced follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTMCATIOCI:I Mdfy that 111C ilINftnatiuu ptuvWed heron is true and accurate to the best of my knowledge. <br /> APPLKGANT SIGNATURE,r' 490.70 DATE: A9O n <br /> � OSS f q /U <br /> R _L T �.--wr❑ Fr61 0woeri0o ;or [1 3.A m y <br /> 490.75 APPLICANT TITLE: 49479 <br /> APPLICANT NAME(print): <br /> rACLN <br /> 1 IWIT I1ST-D(]2/2007)3/4 <br /> V <br />