My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:56:43 PM
Creation date
3/24/2020 4:10:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r , <br /> TANK ANNULAR TESTING <br /> Test Method By: • Manufacturer Industry Standard Professional Engr. Other(see below) <br /> Test Method Uses: Pressure • Vacuum Hydrostatic Other(see below) <br /> Measuring Equipment Used: Vacuum Gauge (range 0 to 30 inches Hg) <br /> Description Tank#1 Tank#2 Tank#3 <br /> Tank manufacturer Xerxes Xerxes Xerxes <br /> Tank material FRP FRP FRP <br /> Tank capacity (US gallons) 30,000 12,000 8,000 <br /> Product stored Gasoline-87 Gasoline-91 Diesel <br /> Is this a multi-compartment tank? No Yes Yes <br /> Dry or Brine filled annular? Brine FIW Brine Ftlled N/A <br /> (if brine filled,perform no vacuum testing) <br /> Monitoring system show normal annular? Yes Yes N/A <br /> Is water table above tank bottom? Unknown Unknown WA <br /> Was sensor removed for testing? N/A N/A N/A <br /> Was sensor property replaced after testing? N/A N/A N/A <br /> Wait time for vacuum to stabilize (hrmin) <br /> Test start time <br /> Inftial vacuum (inches Hg) <br /> Test end time <br /> Final vacuum (inches Hg) <br /> Test duration (hr:min) <br /> Change in vacuum (r>ches Hg) <br /> Pass/Fail threshold (inches Hg/hour) <br /> TEST RESULT <br /> Comments: <br /> Both physical tanks have brine filled annulars. <br /> Vacuum testing is not required. <br /> :c: 2003 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.