My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:56:43 PM
Creation date
3/24/2020 4:10:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: Manufacturer • Industry Standard Professional Engr. Other(see below) <br /> Test Method Uses: • Pressure Vacuum Hydrostatic Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 10 prig) <br /> Description Line#1 Line#2 Line #3 <br /> Pipe manufacture_r Ameron LCX Ameron LCX Ameron LCX <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) Y 2" 7' <br /> Secondary pipe diameter (inches) 21N' 2W' 2W' <br /> Tank product Gaso ine-87 Gasoline-91 Diesel <br /> Method of secondary pipe isolation Clamshells Clamshells Clamshells <br /> Location of secondary pipe isolation Sump/UDC's Sump/UDC's Sump/UDC's <br /> Estimated length of piping run (feet) 210' 200' 180' <br /> include length of branch runs <br /> Wait time for pressure to stabilize (hr:min) 0:15 0:06 0:05 <br /> Test start time 8:00 AM 8:01 AM 9:15 AM <br /> Initial pressure (psig) 5 5 5 <br /> Test end time 9:00 AM 9:01 AM 10:15 AM <br /> Final pressure(psig) 5 5 5 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0 0 0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> �5 2003 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.