My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:56:43 PM
Creation date
3/24/2020 4:10:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> Guide Specifications —..-Hvdrostatic. Monii. <br /> Part 1: General The monitoring liquid may be: salt brine(30%CaCl n <br /> 1.0 The tank manufacturer shall supply a continuously moni- water). <br /> tored hydrostatic head pressure leak detection system, The The probe shall detect and report a change in liqui( level <br /> system shall be designed by the manufacturer to detect a either above(high-alarm point)or below(low-alarrr point) <br /> leak in either the primary tank or the secondary tank in the neutral level established during the initial filling ind sub- <br /> either a wet or dry excavation. sequent maintenance of the system. The probe sha not <br /> The system shall include:a brine solution (to prevent freez- operate by inducing an electrical current into the lic uid <br /> ing) delivered to thejob site in the interstice of the double medium that is being monitored. <br /> wall tank, a reservoir mounted on top of the tank to provide The sensing range represents a built-in allowance f r pres- <br /> a liquid medium for monitoring, and an electronic mQnitor- sure and thermal variation. Until the liquid level exceeds the <br /> ing system to sound an audible and visual alarm when the allowable variation, the probe shall not send a signal to the <br /> liquid level of the reservoir rises or falls to predetermined monitor unit. <br /> alarm points.The system shall also include an electronic <br /> sensing probe to monitor the attached collar riser for the The probe shall be capable of being mounted in the reser- <br /> submersible pump, if so specified. voir in a manner that allows adjustment of location, The <br /> probe must be able to be mounted so that normal fluctua- <br /> tions of the liquid level do not interfere with the normal <br /> Part II: Standards operation of the probe. <br /> 2.0 The double wall tank with a brine-filled interstice shall be list- The probe shall be capable of operating at a distance of 500 <br /> ed by Underwriters Laboratories.The electronic monitoring feet from the control panel. <br /> system used to monitor the liquid reservoir and the attached 4.2 Attached Collar Riser Probe <br /> collar riser shall also be listed by U.L. for intrinsic safety in a (if applicable and shown on the drawing) <br /> hazardous location. The probe shall be constructed of a material that is suitable <br /> All equipment shall be installed in accordance with the man- for prolonged, complete immersion in any of the fluids listed <br /> ufacturer*s instructions and all applicable federal, state, and in U.L. Standard for Safety 13 16, Table 14.1, all columns <br /> local laws and regulations. The probe shall detect the presence of liquid in the riser <br /> when the liquid level has risen to a maximum of one inch <br /> above the bottom of the probe, as located in its permanent <br /> Part III: Requirements for mounting position. The permanent mounting position is <br /> Liquid-Filled Double Wall Tank determined by the installer at the time of installation <br /> 3.0 The interstice of the double wall tank shall be filled with a The probe shall be capable of being mounted in tle riser in <br /> brine solution, Tanks up through 30,000 gallons shall be a manner that allows adjustment of location. The probe <br /> delivered to the site with the brine solution in the inter- shall be able to be mounted so that an increase in the liquid <br /> stice. The reservoir shall be constructed of fiberglass and level does not interfere with the normal operation of the <br /> mounted directly to the top of the tank. The reservoir shall probe. <br /> be fitted with one 4" NPT fitting for installation of the The probe-mounting assembly supplied and installed by <br /> electronic-reservoir probe. contractors shall provide protection for the probe from the <br /> operational activities that may take place within the riser <br /> The probe shall be capable of operating at a distance of 500 <br /> Part IV: Requirement for the feet from the control panel. <br /> Electronic Monitoring System 4.3 Operating Parameters: <br /> 4.0 The Controller Temperature: 00 F to 1500 F <br /> The panel shall receive the signal from the reservoir and/or Voltage: I 10 or 220 VAC, 50/60 Hz <br /> attached collar riser and provide for the following indications: <br /> I System normal Part V: Performance <br /> 2. System fault(The"fault"indication must not be the same 5.0 The continuous hydrostatic-monitoring system, including the <br /> as the"alarm"indication.) electronics and the probes, shall be capable of detecting <br /> 3 System leak alarm and alarming when the liquid level in the tank reservoir rises <br /> Also. a system-test switch indicating the system is functional or drops beyond the allowable variation. <br /> snail be provided. <br /> All alarms shall be both audible and visible. Part VI: Materials <br /> The unit shall be able to be reset, 6.0 The materials used in the monitoring system shall be <br /> The control panel shall provide indication of which tank is in corrosion resistant to the liquid used to fill the interstice <br /> the alarm condition, if more than one tank is being moni- <br /> [ored. <br /> The control panel shall be capable of monitoring up to eight Part VII: Installation <br /> probe points. 7.0 The monitoring systems shall be installed in accorc ince with <br /> The system shall provide intrinsic safety at the probe locations: the manufacturer's installation instructions, and all �pplicat)le <br /> 4.1 Reservoir Probe federal, state, and local laws and regulations. <br /> The probe shall be constructed of a material which is suitable <br /> for prolonged, complete immersion in the monitoring liquid. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.