My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
INSTALL_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:56:43 PM
Creation date
3/24/2020 4:10:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? v <br /> Z <br /> Guide , ge <br /> SHORT FORM: B. Product Storage: <br /> The contractor shall provide Double Wall Fiberglass I. Tanks shall be capable of storing petroleum Drod- <br /> Reinforced Plastic (FRP) Underwriters Laboratories-labeled ucts with specific gravity up to 1.1. <br /> underground storage tanks as shown on the drawings. Sizes 2. Tanks shall be vented to atmospheric pressLke The <br /> and fittings shall be as shown. The tanks shall be Fiberglass tank is not designed as a pressure vessel, ex epc for <br /> tanks as manufactured by Xerxes Corporation. use with vapor-recovery systems, provided Me <br /> Tanks shall be tested and installed with pea gravel or crushed pressure of vacuum does not exceed I psi. <br /> scone as specified in the current installation instructions pro- 3. Gasoline; gasohol (90%gasoline/10%ethai iol mix- <br /> vided with the tank. ture); 90.5%gasoline and 9.5%Oxinol-50' (4 75% <br /> LONG FORM: Section 13177-1 methanol and 4.75%GTBA mixture), Dupont EPA <br /> waiver (gasoline with 5%methanol and a minimum <br /> Part 1: General of 2.5%cosolvent-gasoline with up to 20% (by vol- <br /> 1.01 Related Work Specified in Other Sections ume) of MTBE; gasoline/water/ethanol oi 4thanol- <br /> blend motor fuels, including 100%ethanol or <br /> A. Liquid-Level Gauges.- Section 15 174 methanol or M85 (85%methanol) at ambient tern- <br /> B. Plastic Pipe: Section 15064 peratures;jet fuel; av-gas; kerosene; diesel fuel, new <br /> or used motor oil; or used for fuel oil at temperatures <br /> C.Anchor Bolts: Section 05501 not to exceed 1500F. <br /> D. Cast-in-Place Concrete: Section 03300 C. Materials: 1 <br /> 1.02 Quality Assurance 1.Tanks shall be manufactured with 100% resin and <br /> A.Acceptable Manufacturer:Xerxes Corporation glass-fiber reinforcement. No sand fillers <br /> B. Governing Standards, as applicable: D. Tank Dimensions (Refer to Xerxes literature on <br /> 1.ASTM standard document number D4021-92. gallonage.): <br /> 2. Underwriters Laboratories, Inc. (U.L.) Standard for 1.Tank shall have nominal capacity of-gallons <br /> Safety 13 16, File MH 9061 for storage of flamma- 2,Tank shall have nominal outside diameter of <br /> ble liquids.A U.L. label shall be attached to feet. <br /> each tank. 3.Tanks shall have approximate overall length of <br /> 3. National Fire Protection Association (NFPA) feet. <br /> Standards: E. Interstitial Space <br /> NFPA 30: Flammable and Combustible Liquids 1.Tank shall have a space between the primary and <br /> Code secondary shelf walls to allow for the free flow and <br /> NFPA 30A:Automotive and Marine Service Station containment of all leaked product from the primary <br /> Code tank. The space also allows the insertion of a moni- <br /> NFPA 3 1: Installation of Oil-Burning Equipment. toring device through a monitoring fitting. <br /> 4. City of New York Department of Buildings M.E.A., 2.02 Appurtenances and Accessories <br /> Divison #I 61-89-M. A. Optional Anchor Straps <br /> 5.Los Angeles Fire Department. 1.Straps shall be FRP anchor straps as supplied by <br /> Part 11: Products tank manufacturer. <br /> 2.Number and location of straps shall be specified in <br /> 2.01 Double %X/all Fiberglass Reinforced Plastic III current literature by tank manufacturer <br /> Underground Storage Tanks: B. Manways <br /> A. Loading Conditions-Tank shall meet the following I.All manways are to be flanged and 22" 1 D., com- <br /> design criteria: plete with U.L. listed gaskets, bolts and covers (30' <br /> 1.Internal Load-Tank shall withstand a 5-psi air- and 36"1.D. manways are also available) <br /> pressure test with a 5:1 safety factor. Contractor 2.Location is shown on standard tank drawings <br /> shall individually test tanks for leakage prior to <br /> installation. Maximum test pressure is 5 psi. 3.Optional manway extensions shall be FRP and <br /> 2.Vacuum Test-To verify structural integrity, every 24" long. <br /> tank shall be vacuum tested by the manufacturer at 4.Each steel manway cover shall have a minimum of <br /> the factory to 1 1.5 inches of mercury. three 4" NPT fittings. (See Dimensional Data on <br /> 3.Surface Loads-Tank shall withstand surface H-20 page 7-9 for actual size and quantity of fittings <br /> axle loads when properly installed according to C. Optional Fill Tubes <br /> current manufacturer's installation instructions. 1.Fill tubes shall be FRP or contractor supplied and <br /> 4.External Hydrostatic Pressure-Tank shall be installed aluminum. Locations are shown on <br /> capable of being buried in ground with 7'of over- drawings. <br /> burden over the top of the tanks, the hole fully 2.FRP tubes shall be 4"diameter, with a 6'x 4"ciou- <br /> flooded and a safety factor of 5:1 against general ble-tapped reducer bushing, and include a 6-NPT <br /> buckling. fitting on the tank. FRP tubes can be installed in <br /> 5.Tanks shall support accessory equipment-such as the manway cover or tank shell wall.Aluminum <br /> heating coils, drop tubes, submersible pumps and tubes (contractor supplied)shall be 4"in diameter <br /> ladders-when installed according to tank manu- and fit directly into a 4"NPT fitting. Tubes shall ter- <br /> facturer's recommendations and limitations. minate a minimum of 4"from the bottom of tank <br /> 18 *TM Arco Chemical Co <br />
The URL can be used to link to this page
Your browser does not support the video tag.