My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013080
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
3566
>
2600 - Land Use Program
>
PA-1700258
>
SU0013080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:00 AM
Creation date
3/25/2020 9:10:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013080
PE
2632
FACILITY_NAME
PA-1700258
STREET_NUMBER
3566
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95304-
APN
23906018
ENTERED_DATE
3/10/2020 12:00:00 AM
SITE_LOCATION
3566 W ELEVENTH ST
RECEIVED_DATE
3/9/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION - TIME EXTENSION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: TE- <br /> TO BE COMPLETED BY THE APPLICANT PRIOR.T FILING THE APPLICATION i <br /> Applicant Information <br /> Name,Jasdeep Singh&Harminder Kaur <br /> Address: --- <br /> Phi:(209)640-1000 <br /> Permit Irdarmatiort <br /> Permit Number(s):PA-1100258 Date Approved:August 21,2018 <br /> Approving Agency: x Staff Planning Commission Board of Supervisors <br /> Expiration Gate:March 1,2020 1 Extension Requested on:January 28,2024 <br /> Give the reason for the request for a time extension(include(he chcurnstancee that have prevented the project from preceding on <br /> schedule: <br /> s We will be requiring an extension due to the following unplanned unforceeable chain of events that ; <br /> led to delay in execution of tasks in a Manned timely manner: <br /> - Beyond scope delay of Geaotechnical engineering study done by Terracon which took an <br /> aditionaly delayed time of 3-4 months putting everything at an ofset <br /> - Change in orginisational stucture of our engaged architectual consultant (Siegfried) They i <br /> went through some or inisational restructudnq which let to re-assigning of a consultant to our <br /> case and this eventually led to a deffer in executtort of tasks as lore had tart e h^t start aver <br /> from scratch to brim the new consultnt Lip 1n s13d <br /> I <br /> He vw much additional time Is being requested-,One Year <br /> NOTE: Time Extensions can be granted for up to 1 year for development applications and up to 6 years for subdivisions, <br /> Signa )ate: 6 / 2 207 <br /> SIGNATURE <br /> Fiie No. Receipt No, <br /> Accepted by: Data: <br /> F3DEV5VC',P1aernirV Applicabon Forme Page I of 1 Job Pio 2018-187 Time Extem. <br /> rm)te ExSrnsiur.c aC.,('Revised 0"45) <br /> 3c' - o60 • l g- <br />
The URL can be used to link to this page
Your browser does not support the video tag.