My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLb,- <br /> SWRCB,January 2002 MAY 2016 I'age of <br /> 6. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑ Industry Stvd4a . ,L_arofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run#5 Piping Run#6 Piping Run#7 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: Approx.85' Approx.100' Approx. 115' <br /> Product Stored: Regular 87-Vent Super 91-Vent Diesel-Vent <br /> Method and location of Clam Shell Test Port Clam Shell Test Port Clam Shell Test Port <br /> piping-run isolation: at Vent Box Sump at Vent Box Sump at Vent Box Sump <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:00 9:55 9:50 <br /> Initial Reading(Ri): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:00 10:55 10:50 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: I Hour 1 Hour I Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result I Pass Pass Pass <br /> Comments— (inchide information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.