Laserfiche WebLink
S W RCB, January 2002 Page t of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: ,e a to-. C - 5 l+Voe 10 Equipment Resolution: l /D 19 szt- <br /> Piping Run# Piping Run# Piping Run # '7 aping Run# <br /> Piping Material: i 64,Ki (4, 5 5 F5S <br /> Piping Manufacturer: , � d <br /> Piping Diameter: I e �, ► 1 •� <br /> Length of Piping Run: Ap 0 yvX. 101) 0 00x ' ? ddx- too p <br /> Product Stored: I I I I <br /> — ItA u(a tv- t-,4. <br /> Method and location of C l w�St,t I c(Q- 5ket I T--s+ C lo-,- 6lAw"t-le,1 - <br /> piping-run isolation: 6,444 tlw <br /> Wait time between applying <br /> pt sure vacuum/water and <br /> test: So I vt crt 5 ;e to r--r ,l l c.r * -e5 -36 <br /> Test Start Time: U , ,fid /D ; g v <br /> Initial Reading(111): S YDS 7r. 5 S 10 5-�:r <br /> Test End Time: /1 , 3d <br /> Final Reading(RF): S P 5 -T" <br /> Test Duration: , k p k ✓- <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: NO Lo •1 f 5 T .1 'i✓A P5-17 I A)6 L050,-1- P 5Y -Z <br /> Test Result: Pass ❑ Fail YPass ❑ Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />