Laserfiche WebLink
, <br /> SWRCB,January 2002 Page 5--of� <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry StandardProfessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum ❑ drostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Cot,l 1, 2 ca. Equipment Resolution: ,o oz, <br /> Sump#l Sump# 2 Sump#I Sump � <br /> Sump Diameter: 1►► 2 ►► /q 2 t) 2U`�1z4 <br /> Sump Depth: ► (a 2'► �ad► L n Z f r <br /> Sump Material: f-; 4_V (ef 5 S 6,0 a SS P f G <br /> Height from Tank Top to Top of q r <br /> Highest Piping Penetration. l L 1 1 —7 (a <br /> Height from Tank Top to Lowest ( r+� t► l c, t Z <br /> Electrical Penetration: 111 <br /> _l b <br /> Condition of sump prior to testing: f f <br /> Portion of Sump Tested' W L nl e. 2 t" W 4,W - v_20" W ct -cY L-vy_ 19" W-4er L'au L, l4► <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes 0 No 0 NA Q1Yes 13 No ❑NA Yes ❑No 0 NA 0 Yes �qo 0NA <br /> roduct and water)?, [� <br /> Turbine shutdown response time N-04-A(ex w. Z N64 ,Aka*v e8 No4 ,,A ketvWt eA- <br /> is system programmed for fail-safe Yes 0 No 0 NAYes ❑No 0 NA Yes ❑No ❑NA Yes ❑No ❑NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑Yes o 0 NA ❑Yes f?No 0 NA 0 Yes %10 DNA ❑Yes o 0 NA <br /> op erational? <br /> Wait time betweemg <br /> pressure/vacuum/ ater Od starting _ _ <br /> test: `J w�� w,n,cs `J 1n6 i,+n-e 5 r,1 <br /> Test Start Time: D C? `f S ) S� '7' 3 S <br /> Initial Reading(RD: <br /> Test End Time: <br /> Final Reading(RF): ' 00 ( , oo l 1 DO . 001 <br /> Test Duration: 3 O VVC,w..a-C's 3 ,vv o_LA,'i—S D 8 d k,- <br /> Change in Reading(RF-RD: M p v c <br /> lt <br /> Pass/FaiilThreshold orCriteria: <br /> Test Result: 1-Pass R Fail VPass 0 Fail Pass 0 Fail Pass 0 Fail <br /> Was sensor removed for testing? Yes ❑No DNA l�'Yes ❑No ❑NA '1'es ❑No ❑NA es 0 No d NA <br /> Was sensor properly replaced and Yes ❑No DNA Yes 0 No 0 NA es ❑No ❑NA y'es 0 No ❑NA <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer tonli X of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />