My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: 0 UDC Manufacturer L1 Industry Standardrofessional Engineer <br /> 0 Other(Specify) >� <br /> Test Method Used: 0 Pressure 0 Vacuum VfHydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: CCtLj0j ett �,o_v_LL T� -v C,_6k4vv-- Equipment Resolution: e)6-z-- <br /> fix' s., kN";1 <br /> M77 <br /> gZ� <br /> UDC# CIO UDC# t( C t �UDC# UDC;# <br /> UDC Manufacturer: <br /> UDC Material: /,p 4, AeY 4-S 5 <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested Gu4,fry L h-e- wat <br /> Does turbine shut down when <br /> UDC sensor detects liquid(bothy es 0 No 0 NA 11 Yes No 0 NA 0 Yes \N/ 0 NA FJ Yes No DNA <br /> product and water)?* latus---I— I I/I I <br /> Turbine shutdown response ,q <br /> 06-F 61 ,tm-,,8 A c< <br /> Is system programmed for fail- ?dyes 0 No 0 NA KYes 0 No 11 NA 0 Yes 0O DNA 0 Yes AN4 DNA <br /> safe shutdown?* I A <br /> Was fail-safe verified to be 0 Yes ^o 0 NA 0 YesIN o DNA 0 Yes JNEl\ NA 0 Yes 11 11 NA <br /> operational?' 'P <br /> Wait time between <br /> ,a pp,1 ying <br /> pressure/vacuuni/ter Ind <br /> starting test n )"'l, <br /> Test Start Time: 2- -1 <br /> Initial Reading(Rj): . 00 1 ' 00/ <br /> Test End Time: L 30 1-, Z �- <br /> Final Reading(RF): , Q v e>e) I <br /> Test Duration: 30 t,_1 <br /> Change in Reading(RF-Ri): ulp ti 6 <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: Pass 0 Fail \L21'Pass 0 Fail 13 Pass 0 Fail l Pass ❑ �a <br /> Was sensor removed for testing? T)�'Tes ONo DNA (,�Yes 0 No 0 NA Yes El No 0 NA Yes 0 N� 0 <br /> Was sensor properly replaced and " \ 7K_ ON 11 NA <br /> es 0 No 0 NA ;��Yes 0 No 0 NA OYes ONo ON Yeso DNA <br /> verified functional after testine? P_Y7 t A --A <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to py of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.