My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2009 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 4:31:56 PM
Creation date
3/25/2020 11:38:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2018
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page L of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 Industry Standard rofessional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum *,Ilydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: 1 er L L (!Ax"y- <br /> &,,,A� ca)tvv Equipment Resolution: r,ocfz_,, <br /> 7-77"" .11 <br /> ZyMpg*,!, 41n: <br /> IV , - , `� 1, , , , <br /> R <br /> R, <br /> UDC UDC# 3 Lq UDC# 5 UDC#-7 t 6 <br /> UDC Manufacturer: k4f-okvp U14 lesi&k/�' <br /> UDC Material: Af <br /> /V i�g Z19 f f <br /> UDC Depth: 2,11 ? ci I) I let 41 <br /> Height from UDC Bottom to Top t q <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: 2,1) G <br /> Condition of UDC prior to <br /> testing: cl V 10 ol V P/1, <br /> Portion of UDC TestedLo k� -cr 6� L, [ta WLwL I b W k4,ry, L,1,16 1 L <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both es 0 No 0 NA Xles 0 No 0 NA C Yes 0 No 11 NA res 0 No 0 NA <br /> product and water ?* <br /> Turbine shutdown response time tj 0--A\ "04- Akca A(a_VW-f,4 A- vw.eA <br /> Is system programmed for fail- <br /> safe shutdown?* Yes 0 No 0 NA 06(es 0 No 0 NA DII(es, 11 No El NA *es 0 No D NA <br /> Was fail-safe verified to be <br /> 0 Yes o, [INA 0 Yes ?eNo DNA 1)Yes 11No 0 NA 0 Yes No DNA <br /> ope ional?' <br /> Wait time between!221ying <br /> pressure/vacuuml(ter1pd <br /> starting test III-4--s S- V,-". <br /> Test Start Time: /,'05-- / I : <br /> Initial Reading(Ri): dor ,0,v / , e�)e I I <br /> Test End Time: le) Z-,O 0 <br /> Final Reading(RF): I e)e) <br /> Test Duration: -�z D 3,4 r-j <br /> Change in Reading(RF-R,): fJz) (-4,L awaN o pJe)Ce4,�'t <br /> Pass/Fail Threshold or Criteria: .00 s 0was— 1+,�e5 as 0 <br /> Test Result: WPass 11 Fail Pass 0 Fail Pass 0 Fail W-Pass 0 Fail <br /> Was sensor removed for testing? )ZYes 0 No 0 NA kYes 0 No 0 NA t*es 0 No 0 NA es El No 0 NA <br /> Was sensor properly replaced and es 0 No 0 NAWIGs 0 No 0 NA Yes 0 No DNA �Kes 0 No 0 NA <br /> verified functional after testing? NAW <br /> 'es <br /> —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.