My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:14:59 AM
Creation date
3/25/2020 4:23:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB,January 2002. Page 5—of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard rofessional Engineer <br /> �g ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum 1> drostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 'moi l j tA.Ae l L�e�L 'r act r Equipment Resolution: , ad 2.5 <br /> Sump# Sump#Z Sump# Sump# —V } <br /> Sump Diameter: aZtf 2�1 L•� . � ' t�x t/ <br /> Sump Depth: <br /> Sump Material: f a 1u.,. piss �+ s A 6 a•• fe,;S P <br /> Height from Tank Top to Top of r I i t 1 <br /> Highest Piping Penetration: �� 1 <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: l taa <br /> Condition of sump prior to testing: br 0✓ I)V-tA �✓� <br /> Portion of Sump Tested' vLkx-J-r L_ew.L,2-q t' Loet er^(,_ ' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Xlyes ❑No ❑NA �(i�5'es 0 N 0 N es El No 0 N �es ❑No DNA <br /> product and water)?* <br /> Turbine shutdown response time 5 A e 9 5t.4 5 5" <br /> Is system programmed for fail-safe T�_Yes ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA �°fes ❑No -DNA <br /> shutdown? " <br /> Was fail-safe verified to be e'Yes ❑No ❑NA �,es ❑No ❑NA >6res ❑No ❑NA 'Yes ❑No ❑NA <br /> operational?* <br /> Wait time between,applying <br /> pressure/vacu wa d starting <br /> test: 10 A`V S L D r-n r,.uR 4--ev I b/ -I rti. L�-�S /O i M444-rS <br /> Test Start Time: ' l U ,' y U :S5 9- 05 <br /> Initial Reading(RI): E=rk5 F � F$f 41AC-6141 <br /> Test End Time: 0! to I U : �5 ' 35 <br /> Final Reading(RF): rrv5+- Ge�-G 2 ( n 5C.*+,CA- —F�s-��+o' f-'i <br /> Test Duration: 30 f'1 I kw+-e 5 D P°1 i NK t 30 r'�c►,n t S 3 0 I>t wM <br /> Change in Reading(RF-RI): I.10 CA,_�_ --- CLC--tt +�v G� •f <br /> Pass/Fail Threshold or Criteria: ,b eS 3D P. pCJ .3���' �©a aG,AOA_ r Od <br /> Test Result: ass ❑Fail ass ❑Fail Pass ❑Fail ass ❑Fail <br /> Was sensor removed for testing? } es ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA <br /> Was sensor properly replaced and es ❑No ❑NA 2(Yes0No 0 N ,, Yes 11 No DNA AYes L3 No 0 N <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to anv of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.