Laserfiche WebLink
SWRCB,January 2002 Page__L of� <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: killiping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ther(Specie) <br /> Test Method Used: ressure ❑Vacuum ❑Hydrostatic <br /> D Other(Spec) <br /> Test Equipment Used: )m/Of N'` ° �°t Equipment Resolution: t(/,o '/S ?91-=7 <br /> 11 IIIN,11111111;� <br /> Piping Run#S Piping Run#,16 Piping Run# iping Run# <br /> Piping Material: Flec C4lsS f;I Are&.1 <br /> Piping Manufacturer: <br /> Piping Diameter: t 2-t t <br /> Length of Piping Run: fl wy, (Od t v>�,, ?51 7 PVY• toe) <br /> Product Stored: tzt u .uv V e.�—f- .ewt�t,�, El�.rt-� D4' s�C_ 4— <br /> Method and location of S/ett mad- �de«�.4r,SAgr•f 4�« S�[I/ <br /> piping-run isolation: o,�44 Ye.'H7U.. �✓4•ra'-O4u* R&4,4,x' 'f-s <br /> Wait time between applying <br /> acuum/water and <br /> s test: / Utah 4- <br /> Test Start Time: .'/ �1'.' /5 !•'1S <br /> Initial Reading(Ro: X- <br /> Test End Time: 15 tS <br /> Final Reading(RF): 1054c .S/'®S "P <br /> Test Duration: 2 A4,4+-.5 - 6lov K's 2- /,t %$ <br /> Change in Reading(RF-RI): 4,) i' S-r- 4V tat t'p 0 5 T- <br /> Pass/Fail Threshold or jt-;d Less FN PS-T- j/P C-vsS i ofaG <br /> Criteria: <br /> S NU '� <br /> Pass ❑)Fail ass O,Fail. Pass Q;Fail ❑ Pass . 0 Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />