Laserfiche WebLink
SWRCB,January 2002 Page Y of <br /> 9. SPILUOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Tiet Method Developed By: ❑ X11 Bucket Manufacturer ❑Industry Standard IJ Professional Engineer <br /> '�'•.,,,,� ❑Other(Specify) <br /> Test Method d ❑Pressure ❑Vacuum ❑Hydro c <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment esolution. <br /> 0. <br /> Spill x,# Spill Box# Spill Box# Spill Boz# <br /> 11 M-1 -111.111'..,,N",.I N=Bucket Diameter: <br /> Bucket Depth: '~ <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in ading(RF-RO: <br /> Pass/F ' eshold or <br /> Crit)-.6a: <br /> Test$sWt: ❑ Pass Q F1:. ❑. Pass o]Pail o Pass ❑Fail o Pass ❑'Fail <br /> Com eats— include information on repairs made prior to testing, and recommended ollow-u or ailed tests) <br /> , <br />