My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:14:59 AM
Creation date
3/25/2020 4:23:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 0 of� <br /> S. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sums ❑ <br /> Fill Riser Containment Sumps are Ppment,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard /11(`rofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure D Vacuum 'F-Iydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: egiJwej/ Low(- T-7. r-cse 4-c✓ Equipment Resolution: <br /> Fill Sump#I Fill Sump# 2.,_ Fill SuM# ll Sump# <br /> Sump Diameter: 41) ) 01 442-1 1 <br /> Sum Depth: <br /> to b''( 4- ''I �► <br /> Height from Tank Top to Top of rj v 1"?14 N v PV PA4 P I p P 14 <br /> Highest Piping Penetration: 4"4v W. 4 i W- P <br /> Height from Tank Top to Lowest Zl t <br /> Electrical Penetration: <br /> Condition of sump prior to 7)r ry ®r <br /> testing: <br /> Portion of Sump Tested lac 14-e a44—crLe ZL.26'1 w v 2-z" <br /> SMp Material: i /.0 l ?�g ri SS <br /> Wait time between 9PIVing <br /> pressure/vacuum/ terd <br /> starting test: <br /> Test Start Time: <br /> Initial Reading (Rt): F��s �i�c•t'� F%'�� r/ <br /> Test End Time: 1,9 t 3 2 '_30 ✓! IYO <br /> Final Reading(RF): 1=12-5-A <br /> Test Duration: -To"w <br /> Chane in Reading RF-Ri : <br /> Pass/Fail Threshold or Criteria: as S 3a�s1w' de S <br /> jest* 9XMs ❑F+ail Pais O Fail PASS q Fail ❑Iran reit <br /> Is there a sensor in the sump? KYes ❑No lwyes ❑No es ❑No EiYes ❑ o <br /> Does the sensor alarm when es ❑No D NA <br /> either product or water is es ❑No ❑NA es ❑No O NA ❑ es ❑No �NA <br /> detected? I I i I <br /> Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA es ❑No ❑NA VYesO <br /> ❑ A <br /> Was sensor properly replaced and es ❑No ❑NA �y� ❑No ❑NA Yes ❑No ❑NA ❑ <br /> N\ <br /> verified functional after testing? :p X <br /> COM ments–(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.