Laserfiche WebLink
SWRCB,January 2002 Page 0 of� <br /> S. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sums ❑ <br /> Fill Riser Containment Sumps are Ppment,but were Not Tested ❑ <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard /11(`rofessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure D Vacuum 'F-Iydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: egiJwej/ Low(- T-7. r-cse 4-c✓ Equipment Resolution: <br /> Fill Sump#I Fill Sump# 2.,_ Fill SuM# ll Sump# <br /> Sump Diameter: 41) ) 01 442-1 1 <br /> Sum Depth: <br /> to b''( 4- ''I �► <br /> Height from Tank Top to Top of rj v 1"?14 N v PV PA4 P I p P 14 <br /> Highest Piping Penetration: 4"4v W. 4 i W- P <br /> Height from Tank Top to Lowest Zl t <br /> Electrical Penetration: <br /> Condition of sump prior to 7)r ry ®r <br /> testing: <br /> Portion of Sump Tested lac 14-e a44—crLe ZL.26'1 w v 2-z" <br /> SMp Material: i /.0 l ?�g ri SS <br /> Wait time between 9PIVing <br /> pressure/vacuum/ terd <br /> starting test: <br /> Test Start Time: <br /> Initial Reading (Rt): F��s �i�c•t'� F%'�� r/ <br /> Test End Time: 1,9 t 3 2 '_30 ✓! IYO <br /> Final Reading(RF): 1=12-5-A <br /> Test Duration: -To"w <br /> Chane in Reading RF-Ri : <br /> Pass/Fail Threshold or Criteria: as S 3a�s1w' de S <br /> jest* 9XMs ❑F+ail Pais O Fail PASS q Fail ❑Iran reit <br /> Is there a sensor in the sump? KYes ❑No lwyes ❑No es ❑No EiYes ❑ o <br /> Does the sensor alarm when es ❑No D NA <br /> either product or water is es ❑No ❑NA es ❑No O NA ❑ es ❑No �NA <br /> detected? I I i I <br /> Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA es ❑No ❑NA VYesO <br /> ❑ A <br /> Was sensor properly replaced and es ❑No ❑NA �y� ❑No ❑NA Yes ❑No ❑NA ❑ <br /> N\ <br /> verified functional after testing? :p X <br /> COM ments–(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />