My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:14:59 AM
Creation date
3/25/2020 4:23:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: IManufacturer • Industry Standard Professional Engr. Other(see below) <br /> Test Method Uses: • Pressure Vacuum Hydrostatic Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 10 psig) <br /> Description Line#1 Line#2 Line#3 <br /> Pipe manufacturer Ameron LCX Ameron LCX Ameron LCX <br /> Pipe material FRP FRP FRP <br /> Primary pipe diameter (inches) 2" 2" 2" <br /> Secondary pipe diameter (inches) 2'/x" 2'N' 2%i' <br /> Tank product I Gasoline-87 t Gasoline-91 Diesel <br /> Method of secondary pipe isolation Clamshells Clamshells Clamshells <br /> Location of secondary pipe isolation Sump/UDC's Sump/UDC's Sump/UDC's <br /> Estimated length of piping run (feet) 210' 200' 180' <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:04 0:05 0:05 <br /> Test start time 8:20 AM 9:05 AM 8:25 AM <br /> Initial pressure (psig) 5 5 5 <br /> Test end time 9:20 AM 10:05 AM 9:25 AM <br /> Final pressure(psig) 5 5 5 <br /> Test duration (hr:min) 1:00 1:00 1:00 <br /> Change in pressure (psig) 0 0 0 <br /> Pass/Fail threshold (psig) 0.5 0.5 0.5 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> C 2003 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.