My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:14:59 AM
Creation date
3/25/2020 4:23:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0521604
PE
2371
FACILITY_ID
FA0014678
FACILITY_NAME
NATIONAL PETROLEUM
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
01
SITE_LOCATION
713 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/24/2003 14: 06 20946549RR HMC PAGE 03/04 <br /> Monitorir g System Certification <br /> F. In-Tk nk Gauging/SIR Equipment: ® Check this box iftank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SiR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perforni leak detection monitoring. <br /> Complete the following checklist: <br /> F-11 Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> I <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> i <br /> ❑ Yes 1] No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> I <br /> ❑ Yes No* Were all probes reinstalled properly? <br /> ❑ Yes {] No* Were all items on the equipment manufacturer's maintenance checklist )mpletcd? <br /> *in the Suction H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line,Leak Detectors (Li,D): ❑ Check this box if LLDs are not installed. <br /> Complete (he foliowin checklist: <br /> Z Yes ] No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perfouriance? <br /> N/A (Check all that apply) Simulated leak rate; ® 3 a.p.h,; I❑ 0.1 g,p.lh ; [10.2 g.p.h. <br /> ® Yes ] No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes No* Was the testing apparatus properly calibrated? <br /> ❑ Yes 1.1 No`' For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> f� N/A <br /> ® Yes 13 No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> 0 Yes 1!] No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 1.:7 N/A or disconnected? <br /> @ Yes 0 No* For electronic LUX does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> [;7 N/A or fails a test? <br /> 131 Yes [3 No* For electronic LEDs, nave all accessible wiring connections been visua , inspected? <br /> [: N/A <br /> ® Yes [] No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> in the Se?tion fl, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.