Laserfiche WebLink
11/24/2003 14: 06 20946549RR HMC PAGE 03/04 <br /> Monitorir g System Certification <br /> F. In-Tk nk Gauging/SIR Equipment: ® Check this box iftank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SiR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perforni leak detection monitoring. <br /> Complete the following checklist: <br /> F-11 Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> I <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> i <br /> ❑ Yes 1] No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> I <br /> ❑ Yes No* Were all probes reinstalled properly? <br /> ❑ Yes {] No* Were all items on the equipment manufacturer's maintenance checklist )mpletcd? <br /> *in the Suction H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line,Leak Detectors (Li,D): ❑ Check this box if LLDs are not installed. <br /> Complete (he foliowin checklist: <br /> Z Yes ] No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD perfouriance? <br /> N/A (Check all that apply) Simulated leak rate; ® 3 a.p.h,; I❑ 0.1 g,p.lh ; [10.2 g.p.h. <br /> ® Yes ] No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes No* Was the testing apparatus properly calibrated? <br /> ❑ Yes 1.1 No`' For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> f� N/A <br /> ® Yes 13 No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> 0 Yes 1!] No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 1.:7 N/A or disconnected? <br /> @ Yes 0 No* For electronic LUX does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> [;7 N/A or fails a test? <br /> 131 Yes [3 No* For electronic LEDs, nave all accessible wiring connections been visua , inspected? <br /> [: N/A <br /> ® Yes [] No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> in the Se?tion fl, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> F <br />