Laserfiche WebLink
S WRCB,January 2002 Page 3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> /❑\Other(Spec i) <br /> Test Method Used: ,,vIressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used.?,e ssu -K s',n N r Iry Equipment Resolution: ' IU-l5 1p's$' <br /> Piping Run#L Piping Run#Z Piping Run#3 Piping Run# <br /> Piping Material: Ff�u�- . �,S ;too � , Irr, <br /> Piping Manufacturer: v+rt 14U1Ovvyt A-*tLve? /� x/r k <br /> Piping Diameter: 2 t 1 2_1 t 3"X2- <br /> Length of Piping Run: yy y, Z cx>l W7✓. L $5 +, t �¢ rUX, 2 d.5 t <br /> Product Stored: bi e se LP 5®1 Ok2 N�f <br /> Method and location of t/ Ty. <br /> - 3 C� ( <br /> piping-run isolation: )0191#4 ►-Srptk - 4.1+4f STIp02 /i6, 41 j <br /> Wait time between applying <br /> -PTI! acuum/water and <br /> s n test: 't- <br /> Test <br /> Test Start Time: <br /> Initial Reading(RO: -17 s <br /> Test End Time: 11" 'V5 r/ <br /> Final Reading(RF): 5�S .57 j 1-Z--' 5, 10S-T. <br /> Test Duration: u✓!s 2—k~V 5 <br /> Change in Reading(RF-RI): 4b PS"f-- '00 5 x• C. <br /> Pass/Fail Threshold or <br /> Criteria: P40 Lpo; Toi /Jd loss Zvi #45:t- N+D 10,s i v%i'OSZ' tja Lots rK psis <br /> Teat Res#fit: .. NePan ❑Fail. an ❑Faii ass ❑Fail ;gss ❑Fair. <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />