My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2041
>
2900 - Site Mitigation Program
>
PR0009006
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 5:13:06 PM
Creation date
3/25/2020 4:52:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0009006
PE
2954
FACILITY_ID
FA0004563
FACILITY_NAME
LIKA CORP
STREET_NUMBER
2041
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16331008
CURRENT_STATUS
02
SITE_LOCATION
2041 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
90189H-APH CON-14 <br /> the 2041 Navy Drive site. A schedule for community relations activities is <br /> provided in Figure 4-1. <br /> Technical Milestones Community Relations Activities <br /> 1. Availability of draft • Establish information <br /> Remedial Action Plan (RAP) repositories <br /> • Develop mailing list, including <br /> contiguous property owners <br /> • Mail out fact sheet explaining <br /> investigations at site, <br /> announcing availability of draft <br /> RAP, announcing public meeting <br /> • Interview community members for <br /> community relations plan <br /> • Prepare Community Relations Plan <br /> • Place a copy of the draft RAP in <br /> each information repository <br /> • Publish and post notice of RAP <br /> availability, public comment <br /> period, public meeting <br /> • Provide 30-day comment period <br /> • Conduct public meeting during <br /> comment period <br /> • Monitor level of community <br /> concern <br /> 2. Final Selection of Remedial • Prepare a responsiveness summary <br /> Action of comments received from public <br /> and DHS responses to those <br /> comments <br /> • Place a copy of the final RAP and <br /> responsiveness summary in each <br /> information repository <br /> • Mail out fact sheet describing <br /> selected action and schedule <br /> H-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.