My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1664
>
2900 - Site Mitigation Program
>
PR0545518
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 2:01:57 PM
Creation date
3/26/2020 1:54:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545518
PE
2950
FACILITY_ID
FA0025841
FACILITY_NAME
PROPOSED UNOCAL SERVICE STATION
STREET_NUMBER
1664
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
02
SITE_LOCATION
1664 MARCH LN
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan March 5, 19.90 <br /> Proposed Unocal Station, Stockton, California AGS 30010-1W <br /> o VOC's by EPA Method 601. <br /> o PCB's by EPA Method 8080 or EPA Method 608. <br /> The composite soil sample will be analyzed for TPHg, and BTEX. <br /> If results of laboratory analyses of the composite soil sample collected from the drill <br /> cuttings indicate no evidence of contamination, the soil will remain onsite. If results of <br /> laboratory analyses indicate evidence of contamination, the soil will be disposed of at a <br /> proper facility with Unocal's authorization. <br /> REPORT PREPARATION <br /> We will prepare a report summarizing our field methods, laboratory procedures, laboratory <br /> results, and conclusions. Information gathered will be considered confidential and released <br /> only with authorization of Unocal. <br /> PROJECT PERSONNEL <br /> Mr. John Bailey Bobbitt, a Registered Geologist (R.G. 4313) in the State of California, will <br /> be in charge of the project. Ms. Eloise Frick, Project Geologist, will manage field and <br /> office operations. Applied GeoSystems employs a staff of engineers, geologists, and <br /> technicians whose services will be used to see the project through to completion. <br /> 11 <br /> Applied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.