Laserfiche WebLink
Work Plan March 5, 19.90 <br /> Proposed Unocal Station, Stockton, California AGS 30010-1W <br /> o VOC's by EPA Method 601. <br /> o PCB's by EPA Method 8080 or EPA Method 608. <br /> The composite soil sample will be analyzed for TPHg, and BTEX. <br /> If results of laboratory analyses of the composite soil sample collected from the drill <br /> cuttings indicate no evidence of contamination, the soil will remain onsite. If results of <br /> laboratory analyses indicate evidence of contamination, the soil will be disposed of at a <br /> proper facility with Unocal's authorization. <br /> REPORT PREPARATION <br /> We will prepare a report summarizing our field methods, laboratory procedures, laboratory <br /> results, and conclusions. Information gathered will be considered confidential and released <br /> only with authorization of Unocal. <br /> PROJECT PERSONNEL <br /> Mr. John Bailey Bobbitt, a Registered Geologist (R.G. 4313) in the State of California, will <br /> be in charge of the project. Ms. Eloise Frick, Project Geologist, will manage field and <br /> office operations. Applied GeoSystems employs a staff of engineers, geologists, and <br /> technicians whose services will be used to see the project through to completion. <br /> 11 <br /> Applied GeoSystems <br />