Laserfiche WebLink
8-F_ c-FA"L--P. o VUS-g N S <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> I START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provislons of the permit. <br /> 3. CLEAN PAVEMENT: . :Dirt and mud.shalI not be deposited on the pavement <br /> outside the area of work, and if lhadvettently tracked onto the road travel-way shall <br /> be removed Immediately. <br /> 4. DA.ILY.RESTOk.ATI6N:• Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHERjXG$T'CONDITION: All trenches shall be-filied and compacted, <br /> ditches an othdr drainage facilities regraded and opened' ,'and the entire work area <br /> restored to weather;--tight condition prior-to any rain. <br /> r <br /> S <br /> tt <br />