Laserfiche WebLink
• Conduct a "tailgate" meeting on the first day before field activities commence <br /> • Stop work if the health or safety of workers is in question <br /> • Observe workers for signs and symptoms of exposure to contaminants <br /> • Evaluate the effectiveness of the personal protective equipment program on an <br /> ongoing basis and upgrade the program as needed <br /> • Inform workers of any changes in the health and safety practices <br /> • Perform daily reviews of the work practices and compliance with the SSHP <br /> • Note any signs of worker exposure or stress and take proper action immediately <br /> • Prevent unauthorized personnel or equipment from entering the exclusion zones <br /> All personnel who enter the work area must comply with the health and safety practices <br /> and procedures described in this SSHP. All incidents at the site, such as injuries or near <br /> misses, must be reported to the following people as soon as possible: <br /> Project Supervisor: Jon A. Rosso <br /> Telephone Number: (925)426-2676 <br /> Project Manager: Michael Hurd <br /> Telephone Number: (925)426-2673 <br /> Health and Safety Officer: Michael Hurd <br /> Telephone Number: (925)426-2673 <br /> Project Site Safety Officer: Craig Pelletier <br /> Telephone Number: (925)426-2607 <br /> Roles and responsibilities of the key personnel are described below. <br /> Proiect Supervisor <br /> The Project Supervisor, Mr. Jon A. Rosso,has the responsibility for all fieldwork and <br /> enforces safe work practices by all workers. He directs all project investigation, <br /> monitoring, and remedial activities at the site. <br /> PL\SAEWR0JECTS\2003W3759 Shea Momnain HouseWeigh b,c,dgnvst C_DKA DdineationWHPAm <br /> 2 <br />