Soil-Vapor Sampling and Analysis Work Plan <br /> Former Shell Central Valley Crude-Oil Pipelines August 15,2007 <br /> Machado Property(Neighborhood B)Parcel 209-060-08 Page 3 of 4 <br /> Area of Excavation Sample Depth <br /> Excavation Depth (feet bgs) (feet bgs) <br /> B2 13 14 <br /> B3 24 25 <br /> B6 9.5 10.5 <br /> B8 10 11 <br /> B9 30 31 <br /> B 12 17 18 <br /> For each area where soil gas is sampled,an additional sample location is planned immediately adjacent to <br /> the above-listed excavation areas(to the northeast,in the inferred down-gradient groundwater flow <br /> direction),from which vertical profile samples will be collected at 5, 10,and 15 feet bgs. In the event that <br /> a soil-vapor sample is unattainable as a result of high moisture content(due to proximity of the water <br /> table to the sample point)or due to difficulty penetrating the subsurface to the targeted depth,the location <br /> will be abandoned. <br /> A total of 24 soil-vapor samples from six excavation areas will be collected through temporary soil-vapor <br /> probes with the use of a Geoprobe®rig. The remaining six areas(131, B4,B5, B7, 1310,and B11)will not <br /> be sampled due to the shallow depths of impacted soil and/or low to non-detectable concentrations of the <br /> constituents of concern in these areas. <br /> Soil-Vapor Sampling Procedures <br /> Soil-vapor sampling will be performed in accordance with procedures outlined in two guidance <br /> documents issued by the California Environmental Protection Agency(Cal/EPA). These documents are <br /> titled Advisory—Active Soil Gas Investigations published January 28,2003,and Guidance for the <br /> Evaluation and Mitigation of Subsurface vapor Intrusion to Indoor Air published December 15,2004, <br /> and revised February 7,2005. The procedures are outlined below. <br /> • Soil-vapor samples will be collected through temporary probes advanced using a Geoprobe®rig. <br /> • Prior to soil-vapor sample collection at least 30 minutes should elapse following retraction of the <br /> probe tip to allow the subsurface soil-vapor conditions to equilibrate. <br /> • The soil-vapor probe will be constructed such that it consists of one continuous run of tubing <br /> from the base of the vapor-probe borehole to the ground surface,with a check valve at the ground <br /> surface. <br /> • A flow regulator will be placed between the probe and the SummaTm canister to ensure that the <br /> canister is filled at the appropriate flow rate. Flow rates should not exceed 200 milliliters per <br /> minute(ml/min). <br />