Laserfiche WebLink
Mr. Bonham • 4 29 September 1995 <br /> Of the site response to the technology. Further, if the technology is to be run intermittently as <br /> vadose zone conditions permit, it would be particularly useful to have some understanding of <br /> the expectable variations in response patterns. We recommend that the test be run long enough <br /> to determine whether there might be a dropoff. <br /> In conclusion, we look forward to reviewing the results of the pilot testing. Please submit a revised <br /> schedule of work for the aquifer testing and the installation of the pilot test wells. We strongly <br /> recommend that the work begin before winter sets in, in order to assess site behavior during the <br /> rising water table season. <br /> All parties sem to agree that a remedial plan of action at the STTC facilities will most likely need to <br /> include one or more bioremediation components.Therefore, we request that you submit a <br /> proposed schedule for additional bioassessment and development of a feasibility study for <br /> bioremediation. This work should include preliminary consideration of the B, C, and D zones in <br /> the aquifer system. <br /> Please inform us at least 3 working days in advance of site work or well installation, so that we <br /> may observe if desired. <br /> We will comment separately on the proposed of Monitoring and Reporting Order 93-807. <br /> If you have any questions,please contact me at(916)-255-3119. <br /> i <br /> V <br /> WI � <br /> TT, C.E.G. <br /> Associate Engineering Geologist <br /> GW:gw <br /> cc: Ms. Diane Hinson, San Joaquin County Public Health <br /> Mr. Alexander Krygsman, Port of Stockton <br /> Mr. Kyle Mullins, ST Services <br /> Mr. Robert Donovan,Tesoro Marketing, Refining, and Supply Company <br /> Ms Anastasia Duarte,Time Oil <br /> Ms. Marilyn Guthrie, ARCO Products Company <br /> Mr Steven McDonald, Luce,Forward, Hamilton, and Scripps <br />