Laserfiche WebLink
1L No . De- ' 4 ,93 16 : 54 NG .0' 1 P .01 <br /> STATE OF CALIFORNIA - Environmental Protection Agency PETE WILSON Go •nor <br /> i <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLBY REGION <br /> 3443 Routier auad, 9ulte A <br /> Sacramento, CA 95877.3098 <br /> PHONE; (91 a)2683000 <br /> FAX:(916)266.3015 <br /> Post-It"brand fax transmittal memo 7671 x*IPWS . <br /> 14 December 1993 7e R.Ay THvn Prem Aim cog." <br /> Co. ARX-0 Co. <br /> CV(1 CS <br /> Dept. Q41V11 -ON614E4I Miw4 ZSS— ;04F <br /> eaxa(,),I C— �2�� Fexw qt& Zrr-?OLS <br /> Mr. Roy Tbun, Chair <br /> Stockton Terminals Technical Committee <br /> c/o ARCO Products Company <br /> P.O. Box 2570 <br /> Los Angeles, CA 90051-0570 <br /> INTERIM REMEDIAL ACTION PLAN, STOCKTON TERMINALS TECHNICAL <br /> COMMITTEE, SAN JOAQUIN COUNTY <br /> Enclosed is a memorandum which summarizes your recent discussion of the Interim Remedial Action <br /> Plan (TRAP) with Philip Isorena of my staff, In summary, following are the timelines the STTC <br /> must meet: <br /> I. By 15 December 1993, summarize in a letter the agreements reached with staff regarding the <br /> IRAP including the addition of enhanced biodegradation (via air sparging and/or addition of <br /> nutrients) in the existing Time Oil trench system, if such addition is feasible. <br /> 2. By 15 December 1993, submit a response to our 18 November 1993 letter, <br /> 3. By 15 December 1993, submit a time schedule for the fast track tasks listed on Page 4 of the <br /> IRAP and specific tasks related to the TRAP. <br /> 4. By 30 December 1993 and every month thereafter, submit a progress report on the status of <br /> ]RAP and Phase II work. <br /> 5. By 30 December 1993, start IRAP work. <br /> 4 , <br /> 1 <br /> I <br />