My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1L No . De- ' 4 ,93 16 : 54 NG .0' 1 P .01 <br /> STATE OF CALIFORNIA - Environmental Protection Agency PETE WILSON Go •nor <br /> i <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLBY REGION <br /> 3443 Routier auad, 9ulte A <br /> Sacramento, CA 95877.3098 <br /> PHONE; (91 a)2683000 <br /> FAX:(916)266.3015 <br /> Post-It"brand fax transmittal memo 7671 x*IPWS . <br /> 14 December 1993 7e R.Ay THvn Prem Aim cog." <br /> Co. ARX-0 Co. <br /> CV(1 CS <br /> Dept. Q41V11 -ON614E4I Miw4 ZSS— ;04F <br /> eaxa(,),I C— �2�� Fexw qt& Zrr-?OLS <br /> Mr. Roy Tbun, Chair <br /> Stockton Terminals Technical Committee <br /> c/o ARCO Products Company <br /> P.O. Box 2570 <br /> Los Angeles, CA 90051-0570 <br /> INTERIM REMEDIAL ACTION PLAN, STOCKTON TERMINALS TECHNICAL <br /> COMMITTEE, SAN JOAQUIN COUNTY <br /> Enclosed is a memorandum which summarizes your recent discussion of the Interim Remedial Action <br /> Plan (TRAP) with Philip Isorena of my staff, In summary, following are the timelines the STTC <br /> must meet: <br /> I. By 15 December 1993, summarize in a letter the agreements reached with staff regarding the <br /> IRAP including the addition of enhanced biodegradation (via air sparging and/or addition of <br /> nutrients) in the existing Time Oil trench system, if such addition is feasible. <br /> 2. By 15 December 1993, submit a response to our 18 November 1993 letter, <br /> 3. By 15 December 1993, submit a time schedule for the fast track tasks listed on Page 4 of the <br /> IRAP and specific tasks related to the TRAP. <br /> 4. By 30 December 1993 and every month thereafter, submit a progress report on the status of <br /> ]RAP and Phase II work. <br /> 5. By 30 December 1993, start IRAP work. <br /> 4 , <br /> 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.