My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POHT OF STOCKTON - Revised Schedule for 1993 Phase A Site Assessment <br /> Activities 1 12 1 3 1 4 5 6 7 6 19 1011 1 12 13 14 15 7 18,19120 21 22 23 21 25 26127128129 <br /> • TASK 1 - Prefield Activities <br /> Submsk 1A-Utility Clearance <br /> Subtask 18-Site Safety Meeting <br /> �`z j <br /> Subtask 1C - Permitting 8 Mobilization lz <br /> TASK 2-Resemple 7B-Zona Wells CONDUCTED DURINGTHEJUNE 19930UARTERLVMONITORING EVENT <br /> TASK 3-Resolution of IPAR Data Gaps... <br /> TASK 4-Line d Phase I Assessment <br /> Subtask 4A-Environmental Dembass Review <br /> Subtask 4B-Local Agency File Review <br /> Subtask 4C-Prwiuus Tanana 6 Past Land Uses <br /> TASK 5-Cone Penetrometer Testing <br /> TASK 6-Field Screening Program <br /> Subtask 6A - A-Zone HydroPunch(1) <br /> Submsk 68 - B-Zone HydroPunch (13) <br /> Subtask 6C- C-Zone HydroPunch(16) <br /> TASK 7 - Exploratory Borings 8 Monitoring Well NOTE:a minimum 2-week period of CPT/HydroPunch dam review and well location <br /> Installation approval by STTC 3 RWOCB will occur prior to well installation <br /> Subtask 7A- Borings 8 Well Installation j <br /> Submsk 78-Well Development 8 Sampling <br /> TASK 8- Laboratory Analysis <br /> Subtask SA- Review June 1993 Analytical Dam <br /> Submsk 8B.Analysis of Task 5 HydroPunch Priority Turn-around ! 1 <br /> Samples 30 samples) <br /> Sublask 8C-Analysis of Task 7 B-zone and <br /> C-Zone MI)nitorino Well Samples <br /> TASK 9-Biodegradation Assessment <br /> Submsk 9A- Biologic Sampling 6 Analysis <br /> Subtask 98-Evaluate Biodegradation Dam <br /> TASK 10-Aquifer Testing <br /> Subtask 10A-Slug Tests Wells to be determined- <br /> Subtask 1013-Bail down Tests from existing s new wells <br /> TASK 11 - Interim Product Recovery ONGOING PROGRAM-conducted during monthly groundwater and free product measurement wants <br /> TASK 12 - Reporting IT <br /> Submsk 12A- Evaluate Lateral 8 Vertical Impacts j j <br /> Subtask 12B-Revise Understanding of Site j <br /> Stratiophy s Hydrogeology <br /> Subtask 12C-Resolution of PAR Dew Gaps j <br /> Subtask 12D-Results of Limited Phase I <br /> Assessments <br /> Submsk 12E-Updated Databases,Site Maps,8 j <br /> Cross-Sections <br /> Subtask 12F - Report Preparation <br /> OP.AFf !STTC Review ;FINAL_ <br /> TASK 13-Project Management �— <br /> Subtask 13A- Project Kickoff Meeting <br /> Subtask 13B- Monthly Progress Reports p^ O <br /> Subtask 13C-Meetings with STTC a RWOCB ASREOURED i ____ —}- <br /> Submsk 13D-Budget Tracking <br /> I i <br /> 1 <br /> Prefield Activities Analytical Activities <br /> File Review/Data ReviewActivities Reporting Activities <br /> Field Activities Project Management Activities <br />
The URL can be used to link to this page
Your browser does not support the video tag.