My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:50:21 AM
Creation date
3/30/2020 11:19:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY -10- <br /> 07-26-90 Staff letter to ICW says no information is available on fuel <br /> releases at the port prior to 02-21-81. <br /> 07-27-90 TC letter recommends implementation of interim free phase <br /> hydrocarbon recovery program. <br /> 09-17-90 Staff letter to TC approves implementation of interim recovery <br /> program and requests a technical report describing the recovery <br /> system. <br /> 01-04-91 Geomatrix Consultants, Inc. submits a work plan to assess <br /> diesel contamination at ST due to a recent spill . <br /> 06-24-91 The St. Paul Fire and Marine Insurance (SPFMI) requests infor- <br /> mation on PS fuel problems. <br /> 07-01-91 Staff note on SPFMI letter documents conversation with the <br /> latter. <br /> 07-17-91 Letter from Attorney' s Diversified Services requests informa- <br /> tion regarding copying PS records. <br /> 12-24-91 TC letter to PS says the site assessment work plan (contained <br /> in 11-29-89 comprehensive report) would be finalized during the <br /> next two months, the TC has responded to inquiries by SFPP <br /> regarding the committee, and SFPP has not yet joined the TC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.