Laserfiche WebLink
w w <br /> San Joaquin Local Health District Woodward-Clyde Consultants <br /> Project No. 87530091-MOB3 <br /> November 9, 1987 <br /> Page 2 <br /> standpipe covers or flush-mounted traffic covers set into concrete, as <br /> appropriate. <br /> ° WCC will survey the elevations of the installed monitoring wells and obtain <br /> groundwater elevatioi measurements. A steel tape or electric sounder will be <br /> used to measure the gi undwater elevation. <br /> ° Monitoring wells will be developed by.surging and swabbing,followed by air- <br /> lifting. Wells will be purged using a bladder or suction pump. Following well <br /> purging, a stainless steel bailer will be used to obtain water samples for <br /> analyses for dissolved hydrocarbon constituents. <br /> We would appreciate your expeditious approval of the well permits. Monitoring well <br /> installation is scheduled to begin Ngvember 16, 1987 and continue through November 25, <br /> 1987. If you have any questions,plea'se give us a call. <br /> Very truly yours, <br /> WOODWARD-CLYDE CONSULTANTS <br /> Michael K. Snyder <br /> Project Manager <br /> cc: Steven McDonald,Dorazio,Barnhorst&Bonar <br /> Patricia A Franklin,Port of Stockt 3n <br /> MKS/VTlylb <br /> t� <br /> 6U:a <br /> LNVIRCMENTAL HEALTH <br /> c/mks3 F ERMIT/SERVICES <br />