My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:47:11 AM
Creation date
3/30/2020 11:25:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESULTS <br /> SOUTHERN PACIFIC PIPE LINE, CO. <br /> A 500-foot segment of each pipeline ("diesel", "main" and <br /> ' "Shell/Mobil" lines) was tested under a static pressure of 90 psi or <br /> greater at five points approximately 100 feet apart. <br /> ' Results of the 27 February 1988 tests indicate: <br /> o No leaks were detected on the "diesel" pipeline; <br /> ' o No leaks were detected on the "main" pipeline; and <br /> o No leaks were detected on the "Shell/Mobil" pipeline <br /> tTESORO REFINING, MARKETING AND SUPPLY CO. <br /> ' Approximatley 30-foot segments of three buried six-inch rack lines <br /> identified as "no lead", regular" and "premium' were monitored during a 50 <br /> psi hydrostatic pressure test. <br /> Results of the 27 February 1988 monitoring indicate: <br /> ' o No leaks were detected on the "premium" rack line; <br /> o No leaks were detected on the "no lead" rack line; and <br /> ' o No leaks were detected on the "regular" rack line. <br /> ' While the monitoring information on the Tesoro rack lines might support the <br /> hydrostatic test results, it should not be considered a certifiable test <br /> because of the low hydrostatic pressure during monitoring. <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.