Laserfiche WebLink
1 <br /> ' IV. ACTION PLAN <br /> ' A recovery trench has been installed (Figure 2) from <br /> ' which 5, 200 gallons of gasoline have been pumped. <br /> Product recovery was curtailed on March 4 to allow <br /> undistorted measurements of product and water <br /> ' elevations. Plans are being developed to resume pumping <br /> to recover the remaining gasoline. At the same time, <br /> ' measuring and sampling will continue in an effort to <br /> learn more about the distribution and movement of the <br /> ' gasoline. <br /> ' This work may be considered an "interim remedial <br /> measure" . Further investigation of groundwater <br /> contamination is being conducted which encompasses the <br /> ' entire terminal complex along Navy Drive. Project plans <br /> and schedules for this work are being developed by a <br /> ' Technical Committee comprised of the environmental staff <br /> of the terminals and a representative of the Port of <br /> ' Stockton. <br /> t <br /> 1 <br /> 1 <br /> 1 <br /> ' - 23 - <br />