Laserfiche WebLink
HEALTH AND SAFETY PLAN <br /> Santa Fe Pacific Pipeline Partners, L.P. <br /> Stockton Terminal Facility <br /> Stockton, California <br /> January 1994 <br /> 1.0 PLAN SUMMARY <br /> 1.1 Site Location: Santa Fe Pacific Pipeline Partners, L.P. <br /> Stockton Terminal <br /> 2947 Navy Drive, Stockton,CA <br /> 1.2 Personnel Responsibilities: <br /> Project Manager: Peter Hudson <br /> Project Health and Safety Manager: Tom Boden <br /> Field Health and Safety Manager: Brian Bjorklund <br /> Corporate Health and Safety Manager: David Chawes <br /> 1.3 DescriT)tion of Work: <br /> Task 1. Augering and sampling three additional shallow soil <br /> borings; <br /> Task 2. Installation of an upgradient, B-zone groundwater <br /> monitoring well; <br /> Task 3. Conducting a field treatability test for soil remediation. <br /> 1.4 Identified Hazardous: <br /> Chemical: Hydrocarbon Impacted Soils <br /> Physical: Drilling Equipment, Sampling Equipment, Fire <br /> 1.5 Monitoring Equipment: <br /> Photoionization Detector — H-Nu 101 <br /> MSA Combustible Gas/H2S/02 Meter <br /> Draeger Pump with Benzene Detector Tubes <br /> Page 1 <br />