Laserfiche WebLink
November 2, 1995 • <br /> Page 2 <br /> the well to ensure the grout is not diluted. Grout will then be forced into the well under <br /> pressure. It is anticipated that approximately 2/3 of a cubic yard of grout will be <br /> required to adequately seal the well. When pressure grouting is complete, the well box <br /> will be removed. <br /> If you have any questions regarding the contents of this letter, please call. <br /> Sincerely, <br /> Pacific Environmental Group, Inc. <br /> 0j GFp�O <br /> Douglas Andrews /J 47-V Ci <br /> Staff Geologist OERALDT.UREGAN 0 <br /> No.1627 <br /> ���� • CERTIFIED <br /> ENGINEERING <br /> GEOL IS <br /> Gerald O'Regan 4lF of 110' <br /> Project Geologist <br /> CEG 1627 <br /> • Attachments: Figure I - Site Map <br /> Attachment A - Log of Boring and Well Completion DW-I and <br /> Site Health and Safety Plan <br /> Attachment B - Well Destruction Permit Application <br /> cc: Mr. Carlton Jordan, Shell Oil Products Company <br /> Ms. Gail Wigget, Regional Water Quality Control Board - Central Valley Region <br /> • 1 <br /> 3051351D/DESTWKPL <br /> I <br />