My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005499
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2900 - Site Mitigation Program
>
PR0504875
>
ARCHIVED REPORTS_XR0005499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
3/30/2020 2:15:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005499
RECORD_ID
PR0504875
PE
2951
FACILITY_ID
FA0006377
FACILITY_NAME
CHEVRON PRODUCTS CO (INACT)
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
02
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> iMay 26, 2005 <br /> Mr Harlin KnollUa ECENED <br /> `l <br /> San Joaquin County <br /> Environmental Health Division MAY <br /> 304 East Weber Avenue, Third Floor ���� <br /> Stockton, CA 95202 EWRONMENT HEALTH <br /> Re Well Destruction Workplan PERMIT/SERVICES <br /> Chevron Service Station#9-2396 <br /> 25651 Highway 99 North <br /> Acampo, CA <br /> Dear Mr Knoll <br /> Cambria Environmental Technology, Inc (Cambria) is submitting this Well Destruction Workplan <br /> on behalf of Chevron Environmental Management Company (Chevron) for the site referenced <br /> above Cambria proposes properly destroying all three monitoring wells prior in order to receive a <br /> No Further Action status The proposed scope of work is described below <br /> PROPOSED SCOPE OF WORK <br /> Cambria proposes destroying monitoring wells MW-1 through MW-3 by pressure grout Cambria <br /> anticipates destroying the monitoring wells on June 7, 2005 Attachment A presents Cambria's <br /> standard operating procedures for monitoring well destruction Boring logs for wells MW-1 <br /> through MW-3 are presented as Attachment B Permit applications are presented as Attachment C <br /> Underground Utility Location- Cambria will notify Underground Service Alert prior to <br /> scheduled work to clear monitoring well locations with utility companies <br /> Site Health and Safety Plan. Cambria will prepare a site safety plan to inform site workers of <br /> known hazards and to provide health and safety guidance The plan will be kept on-site at all <br /> times during field activities and signed by all site workers <br /> Cambria <br /> Environmental Permits Cambria is submitting permits as Attachment C A minimum of 48 hours notice will be <br /> Technology,Inc given to San Joaquin County prior to beginning destruction activities <br /> 0itrus Avenue <br /> Suite 9 Well Destruction• Monitoring wells MW-1 thorough MW-3 will be properly destroyed by <br /> Rocklin CA 95677 <br /> Tel(916)630-1855 <br /> Fax(916)630-1856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.