My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0505873
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:10 PM
Creation date
3/30/2020 4:50:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505873
PE
2960
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
01
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 'G -ll' 95(FRI) 1648 HOLT£ & ASSOC SACTO TEL:916 bol 9222 P. 003 <br /> r FkANLLA WINERY <br /> GkOT NDWATER WORKPLAN <br /> i <br /> i 4. The screened length of the new monitoring wells are not identified. Recommend <br /> q sufficient screen length to allow for measurement of high and low variations in <br /> ;l groundwater elevations. Also,the well screen openings should be sized to match the <br /> �j filter p;wk material and the filter pack materials should be sized based upon the results of <br /> a sieve analyses of the materiaL;to be screened acmas, Therefore.the liher pack and the <br /> screen size openings should be bused on the actual stratographic conditions. 'As-built' <br /> well construction details will need to be provided of the new monitoring wells. <br /> S. To aid in sampling and monitoring,4 inch well curings are recommendeJ in The new <br /> wells versus the 2 inch well savings propoud.(opdonal) <br /> 6. When constructing the new monitoring wells,a layer of bentonite pellets or.silica flour <br /> should be placed above the filter pack matorial and allowed to hydrate before a beatonfto <br /> slurry is injected into the annular space of the well. This intermediate step should help <br /> Prevent the filter pack and screen from getting plugged from the sluny, <br /> 7. The workplan does not discuss what well development proceciurna will be followrd npno <br /> Completion of the well construction. <br /> 8. All monitoriug wells must be surveyed by a licensed land surveyor or a regisrarPtl civil <br /> engineer authorized to peiform surveying. <br /> The G-oundwater Monitoring Workplan is conditionally approved,provided all the above <br /> comments and changes ai-e incorporated in the workplan and implemented during well installation. <br /> The information requested on as-builts and construction details can be submitted with tha first <br /> quarterly monitoring report. <br /> If you have any questions,please can meat(916)255-3030. <br /> {� MICHAEL fl. MOSBACHER, P.E. <br /> ( larujectEngillebr <br /> 1 <br /> cc: Mr. Lou Quaccia,The Wine Croup, TUpon <br /> j San Joaquin County Public Works Deparnnent,Stockton <br /> ti <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.